SAS-to-SATA II RAID Subsystem
Installation and Configuration Manual
26
2.2 Preparing the Subsystem and Powering On
Here are the steps to prepare the RAID subsystem for use.
1.
Attach network cable to the R-Link port and connect the other end of network
cable to your network hub/switch. Or as alternative for configuration, you may
connect the serial cable to the Monitor port and to the serial port of your
host/server.
2.
Connect the SAS cable(s) to the SAS Host Channel(s) of the RAID subsystem and
to the SAS switch or SAS HBA on host/server.
3.
Connect the power cord to the AC input socket. Plug the other end of power cord
to the power source.
4.
Press on the Power Switch.
Summary of Contents for Mobileraid MR8X
Page 1: ...DETAILED USER S MANUAL v1 0 MOBILERAID MR8X...
Page 35: ...SAS to SATA II RAID Subsystem 35 Installation and Configuration Manual...
Page 36: ...SAS to SATA II RAID Subsystem Installation and Configuration Manual 36...
Page 37: ...SAS to SATA II RAID Subsystem 37 Installation and Configuration Manual...
Page 38: ...SAS to SATA II RAID Subsystem Installation and Configuration Manual 38...