06-2017
CAP. 2
3 / 6
OPERA
Technical Data - Transportation - Unpacking
EN
Fig. 1
1
2.3 - MACHINE DESCRIPTION
-
Professional espresso coffee machine with 2 or 3 units.
- New multiboiler system with PID control.
- (CDS) Controlo Delivery System: this allows perfectly balanced brewing for any type of coffee.
- Automatic water loading in the boiler.
The machine is manufactured to prepare espresso coffee and hot drinks.
Coffee, hot water or steam are dispensed by means of the units and the controls located in the front of the
machine. A cup heating plate is located on top of the machine.
The machine comprises a frame onto which all components are fastened, closed by panels fastened by screws.
2.4 - TRASPORTATION
---------------------------------------------------------------------------------
2.4.a - Shipment
The machine is shipped in a wooden crate with inner protection inserts.
The type of shipment (plane, truck, railway, etc.) is agreed between the supplier and the purchaser when the
contract is signed.
ATTENTION
The package containing the machine must be transported covered from the weather
and no other crate or other material must be placed on top of it.
The package must always be transported in vertical position, must not be upturned,
set on one side and it must not receive shocks.
2.4.b - Lifting the package (Fig. 1)
The package must be handled with utmost care. Use
suitable lifting equipment to lift and position the pack-
age, chosen according to its weight.
The crate must be lifted by means of a forklift, inserting
the forks into the relevant slots (1) of the pallet.
HAZARD
Lifting and handling operations must be
performed by a specialised and author-
ised technician trained to use the relevant
equipment.
The manufacturer will not be held liable
for any accident or damage to persons or
things arising from failure to observe cur-
rent safety standards pertaining to lifting
and handling materials.
Summary of Contents for Opera
Page 4: ...06 2017 OPERA 0 2 3 CAP 0 Index THE REVOLUTION 2016 ...
Page 6: ...06 2017 OPERA CAP 0 2 2 Index EN THE REVOLUTION 2016 ...
Page 20: ...06 2017 4 4 OPERA CAP 3 Safety devices EN THE REVOLUTION 2016 ...
Page 32: ...06 2017 12 12 OPERA CAP 4 Installation and connection EN THE REVOLUTION 2016 ...
Page 62: ...06 2017 6 6 OPERA CAP 6 Cleaning and maintenance EN THE REVOLUTION 2016 ...
Page 66: ...06 2017 4 4 OPERA CAP 7 Decommissioning EN THE REVOLUTION 2016 ...
Page 67: ......