background image

 

The activation process will install additional RPMs, and make the necessary changes to the GUI behind the scenes. The end result is a 
complete new PBXact system.  This process takes about 3-4 minutes.  

 

When completed you can run the following End of Line testing and all checks should come back Passed.  If you have any failed checks 
wait 5 minutes and run again.  If you still have failed checks please open a support ticket 

.

here

fwconsole sa eol

Summary of Contents for PBXact System 300

Page 1: ...cat 5 into on the appliance as seen below port 0 Plug the other end of the network cable into a network that will provide internet access to the appliance Plug a USB to Serial Console Cable into the...

Page 2: ...the console cable is plugged into For Windows open up device manager and expand the ports area see below example in the above example COM3 is the port From the computer open up a terminal program and...

Page 3: ...en below BOOT Within the Boot menu screen you will be able to see the boot order In the example screenshot below we can see when the PBX starts up it will first try to boot from the OWC Mercury Harddr...

Page 4: ...f the Current Stable version with Full Install Asterisk 13 The following Network Device screen will appear asking you to select the your network cable is plugged into Ethernet interface Since your net...

Page 5: ...r standard DHCP settings recommended press the key on your keyboard to move forward to the button and then press the TAB OK enter key If you want to setup a static IP address press the TAB key over Ma...

Page 6: ...ith your root password that you created in the previous step The final step is to reactivate the appliance with the that originally shipped with your system deployment ID To reactivate your appliance...

Page 7: ...ing the arrow keys on your keyboard navigate to the menu item as seen below BOOT Scroll down to the Boot order and verify or change the system Hard drive is now BOOT Option 1 In the example below the...

Page 8: ...result is a complete new PBXact system This process takes about 3 4 minutes When completed you can run the following End of Line testing and all checks should come back Passed If you have any failed...

Reviews: