56
Then the current position of the prism is
the point to stake out.
△
H indicates the
distance to dig or fill.
△
H is positive: to fill.
△
H is negative: to dig.
【
Stake Out
】
3/3
▲
PtID
6
Type
:
Meas.
R.HT
:
2.000 m
△
X/N
:
0.000 m
△
Y/E
:
0.000 m
Ⅰ
△
H
:
0.000 m Mem.
All
DIST
RECORD
↓
5.5.5 B & D
Bearing and distance stake out. Choose B&D. Input the factors of polar stake-out:
azimuth and horizontal distance.
STEPS
DISPLAY
Turn to the 3
rd
page of the function key
bar. Press B&D.
Input the PtID, azimuth and horizontal
angle to stake out.
【
New Point (Side Shot)
】
Input TGT Pt AZ&Dist.!
PtID
:
50
AZ
:
26°00
′
00
″
:
10.000 m
BACK
Collimate the current prism, and press
DIST to measure. The system calculate
and display the offsets between the
measured point and the point to stake
out.
【
Side Shot Stake Out
】
PtID
:
50
△
Hz
:
-85°51
′
31
″
△
:
1.509 m
Ⅰ
Mem.
NewPt2
DIST
RECORD
BACK
Rotate the telescope until the
△
Hz is
0°00
′00″. Indicate the person who moves
the prism to move the prism according to
the arrows.
Set the prism at the direction on the
0°00
′00″, and press DIST calculate and
display the offsets between the measured
point and the point to stake out.
【
Side Shot Stake Out
】
PtID
:
50
△
Hz
:
0°00
′
00
″
△
:
1.509 m
Ⅰ
Mem.
NewPt2
DIST
RECORD
BACK
Summary of Contents for STS-750RC Series
Page 1: ......
Page 12: ...11 1 8 MENU TREE Menu F1 F4 Confirms the selected menu Press PAGE to view the next page ...
Page 152: ......