S&C PME Pad-Mounted Gear Manual Download Page 12

12

   

S&C Instruction Sheet 665-506

Installation

Cable Terminations

Step 3

Ç

 DANGER

Before energizing the gear, replace the shipping caps on all bushings and bushing wells 
with elbows or insulated protective covers or plugs . 

Failure to replace the shipping 

caps can result in a flashover and serious personal injury or death.

Switch terminals are equipped with 600-ampere-rated bushings, and fuse terminals are 
equipped with 200ampere-rated bushing wells . Bushing and bushing-well interfaces conform 
to  ANSI/IEEE  Standard  386  to  accept  all  standard  separable  insulated  connectors—
“elbows”—and inserts . Appropriate elbows

m

 and inserts must be supplied and installed by 

the user . Before installing elbows and inserts, remove the shipping covers from bushings 
and bushing wells . Ground each insert by connecting a short ground wire from the insert 
to the ground tab directly above the bushing well . See Figure 9 on page 11 .

m

  Switch-termination compartments cannot accommodate 600-ampere elbows manufactured by Blackburn 

when piggybacked .

Figure 10.  Bushings for Mini-Rupter® Switches are available with and without studs to accommodate all 600-ampere elbows.

Viewing windows allow visual verification of switch position

Ground rods extend full width of compartment

600-ampere bushings without studs are 

furnished when Catalog Number Suffix “-M1” 

is specified

Summary of Contents for PME Pad-Mounted Gear

Page 1: ...Instruction Sheet 2 Retain this Instruction Sheet 2 Proper Application 2 General 2 Warranty 3 Safety Information Understanding Safety Alert Messages 4 Following Safety Instructions 4 Replacement Instr...

Page 2: ...nt in this publication is only intended for a specific application The application must be within the ratings furnished for the equipment Ratings for this gear are listed on the ratings label on the i...

Page 3: ...ED ONLY TO THE IMMEDIATE PURCHASER AND END USER AS DEFINED THEREIN OTHER THAN AN END USER NO REMOTE PURCHASERMAYRELYONANYAFFIRMATIONOFFACTORPROMISETHATRELATES TO THE GOODS DESCRIBED HEREIN ANY DESCRIP...

Page 4: ...TICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If you do not understand any po...

Page 5: ...ng carrier immediately 1 Ask for a carrier inspection 2 Note condition of shipment on all copies of the delivery receipt 3 File a claim with the carrier 4 If concealed damage is discovered Notify the...

Page 6: ...d the actuator reaches its stop Refer to Figure 2 This single motion unlatches the mechanism and recharges the latching spring for the subsequent closing operation Pull the door open and secure it wit...

Page 7: ...h the door Pull outward on the cover of the Penta Latch Mechanism to verify that the door has latched securely If it has not use a pentahead or hexhead when applicable socket wrench or tool to rotate...

Page 8: ...enclosure will be bolted directly to the mounting pad using user furnished B inch diameter anchor bolts and supplied hardware Refer to the anchor bolt detail in Figure 4 Anchor brackets and hold down...

Page 9: ...enclosure NOTICE To avoid interference with the TransFuser Mountings the cables to be connected to the fuse terminals must be fed between the horizontal cable guides Special cable training is not requ...

Page 10: ...be assembled to the unit First bolt one of the large deflectors to the bottom of a switch or fuse compart ment frame using the supplied B zn inch serrated nuts Refer to Figures 6 7 and 8 Repeat for t...

Page 11: ...led behind the two large deflectors Then bolt the small deflector into place using the supplied B zn inch serrated nuts Confirm that the complete deflector assembly installation matches Figure 7 on pa...

Page 12: ...elbows and inserts Appropriate elbowsm and inserts must be supplied and installed by the user Before installing elbows and inserts remove the shipping covers from bushings and bushing wells Ground eac...

Page 13: ...tral ground wires to the ground bails and rods provided making sure that cables have sufficient mobility to allow the elbows to be moved from bushings to parking stands Connect the ground pads inside...

Page 14: ...nd replace the bolts to plug the blind tapped holes 1 Check the interior of the pad mounted gear Remove all foreign materials and tools 2 that may have been mislaid and sweep the interior clear of deb...

Page 15: ...onducted at no more than 0 75 times the values shown When making ac tests the time duration for application of the test voltage should be limited to less than 10 seconds 3 The column headed Dc is give...

Page 16: ...Stainless Steel Enclosure1 With Olive Green Outdoor Ultradur Finish A10 With Light Gray Outdoor Ultradur Finish A12 Hexhead Actuator for use in lieu of pentahead actuator on all Penta Latch Mechanism...

Reviews: