background image

20

    S&C Instruction Sheet 1011-510 

Installation and Connection Drawings

Summary of Contents for BankGuard PLUS

Page 1: ...tion Checklist 4 In Shop Setup 4 Ungrounded Wye Banks Installation 5 Test the Control 10 Grounded Wye Banks Installation 11 Test the Control 13 Ungrounded Wye Shunt Reactors Installation 14 Test the C...

Page 2: ...nkGuard Plus Designate a location where you can easily retrieve and refer to this publication Warranty SPECIAL WARRANTY PROVISIONS The standard warranty contained in seller s standard conditions of sa...

Page 3: ...OTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If you do not understand any portion...

Page 4: ...e problems that can occur uring installation NOTE Although it is possible use the faceplate buttons and LCD for the initial setup of the control using the IntelliLink software makes the process faster...

Page 5: ...rds that may be involved This document is written only for such qualified persons and is not a substitute for adequate training and experience in safety procedures for accessing high voltage equipment...

Page 6: ...BankGuard Plus Control includes numbered terminal strips on the back of the enclosure for external control wiring connections See Figure 1 Table 1 and the electrical diagrams at the end of this instru...

Page 7: ...B1 11 Star voltage TB1 12 Star voltage return TB2 A 2nd Lockout O O O C TB2 B 2nd Lockout O O O C TB2 1 Chassis ground TB2 2 Lockout C C C O TB2 3 Lockout C C C O TB2 4 Lockout O O O C TB2 5 Lockout O...

Page 8: ...C 30 Volt Ampere Potential Device s to TB1 9 TB1 10 DB2 11 and TB2 12 phase voltage return Step 4 If necessary connect the potential devices or voltage transformers used for unbalance compensation If...

Page 9: ...e to ground voltage relationships for all but fault conditions The circuits connecting the potential devices voltage transformers to the BankGuard Plus Control must be free of variable loads variable...

Page 10: ...rmation on the LCD If password protection is enabled press the NEXT button again to start scroll ing through password values If the display is blank see the Troubleshooting Instruction Sheet 1011 550...

Page 11: ...ap point and ground should equal the number of series groups between the tap point and the line For capacitor banks with an odd number of series groups per phase the number of series groups between th...

Page 12: ...ircuit of the bank switch operator to TB2 4 and TB2 5 D The closing circuit of the bank switch operator to TB2 2 and TB2 3 E The control device power source 48 250 Vdc 100 240 Vac 50 or 60 Hz as appro...

Page 13: ...INDICATOR or ALARM INDICATOR LED turns ON press the corresponding RESET button to clear it B Press the ENTER button to test the faceplate LEDs All LEDs should turn ON for 2 seconds C Press the NEXT b...

Page 14: ...hazards that may be involved This document is written only for such qualified persons and is not a substitute for adequate training and experience in safety procedures for accessing high voltage equi...

Page 15: ...p 3 Step 3 If necessary connect the potential devices or voltage transformers used for unbalance compensation If the BankGuard Plus Control uses the optional unbalance compensation feature you must al...

Page 16: ...This insures that the monitored voltages accurately represent the magnitude and phase angle of the bus voltages Some possible errors affecting unbalance compensation are Differences in the effective...

Page 17: ...INDICATOR or ALARM INDICATOR LED turns ON press the corresponding RESET button to clear it B Press the ENTER button to test the faceplate LEDs All LEDs should turn ON for 2 seconds C Press the NEXT b...

Page 18: ...BankGuard Plus installation S C Electric Company supports the BankGuard Plus Control with a variety of communi cations hardware options S C SpeedNet Radio UtiliNet Radio Cellnet Radio Microwave Data...

Page 19: ...S C Instruction Sheet 1011 510 19 Installation and Connection Drawings...

Page 20: ...20 S C Instruction Sheet 1011 510 Installation and Connection Drawings...

Page 21: ...S C Instruction Sheet 1011 510 21 Installation and Connection Drawings...

Page 22: ...22 S C Instruction Sheet 1011 510 Installation and Connection Drawings...

Page 23: ...S C Instruction Sheet 1011 510 23 Installation and Connection Drawings...

Page 24: ...Printed in U S A...

Reviews: