background image

S&C Instruction Sheet 1011-540    5

Control Hardware and Software

Applicable Software

This instruction sheet was prepared for use with software 
version 

UPPD106S

 or later releases.

The release date is available on the setup disk label. 

For questions regarding the applicability of information in 
this instruction sheet to future software releases, please 
contact S&C.

This section describes various control components. 

The following section,”Overview of Control Operations,” 
explains how these components work together to monitor 
and manage capacitor bank/reactor operation.

Hardware and Faceplate

Figure 1 shows control hardware components that may 
need to be accessible during regular operation and 
troubleshooting.

The BankGuard Plus Control faceplate includes LEDs 

and buttons for monitoring the capacitor bank/reactor and 
the control. It also includes an LCD screen and buttons for 
scrolling and selecting data.

Local communications port.

 

The control has a port 

on its faceplate for local communication. If the control 
includes communication equipment, it will usually be con-
nected to the SCADA comm port on the back.

Terminal strips.

 

Every BankGuard Plus Control 

includes two numbered terminal strips for connecting to 
the external control wiring. Their configuration is shown 
in Instruction Sheet 1011-510, “S&C BankGuard Plus® 
Control: 

Installation

.”

Figure 1. The location of BankGuard Plus Control components.

Terminal strips
(on back)

Power supply
ON/OFF button

Faceplate Local
Communications
port

Faceplate LCD
and keypad

Summary of Contents for BankGuard PLUS

Page 1: ...eplate 5 Control Software 6 SCADA Communication Equipment 6 Control Operation Overvoltage Protection for Capacitor Banks 7 Protection for Reactors 7 Automatic Control Features 8 Ungrounded and Grounde...

Page 2: ...retrieve and refer to this publication Proper Application WARNING The equipment in this publication is only intended for specific application The application must be within the ratings furnished for...

Page 3: ...ecautions are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If...

Page 4: ...ed only to Qualified Persons See the Qualified Persons section on page 2 2 SAFETY PROCEDURES Always follow safe operating procedures and rules Always maintain proper clearance from energized component...

Page 5: ...essible during regular operation and troubleshooting The BankGuard Plus Control faceplate includes LEDs and buttons for monitoring the capacitor bank reactor and the control It also includes an LCD sc...

Page 6: ...ck perpetual calendar integrated circuit devices are battery backed and have a 10 year battery life in the Non Powered state The real time clock perpetual calendar integrated circuit counts seconds mi...

Page 7: ...Figure 2 This curve applies for up to 300 applications of power frequency overvoltages of the magnitude and duration shown The standard further requires that capacitors be capable of continuous opera...

Page 8: ...than the normal lockout process This logic is activated after a field adjustable time delay of 0 2 to 5 seconds by such faults producing a capacitor bank neutral to ground voltage in excess of an adj...

Page 9: ...wye banks the control uses an ana log input and digital voltmeter to detect the capacitor bank neutral to ground voltage as monitored by an S C 15 Volt Ampere Potential Device A digital filter attenu...

Page 10: ...utral to ground voltage magnitude to the Gross Over Voltage Level Lockout Level and Alarm Level setpoint values if enabled If the compensated neutral to ground voltage magnitude exceeds a setpoint val...

Page 11: ...ded In addition to the neutral to ground potential device one 30 Volt Ampere S C Potential Device is required to be installed on any one of the line phases to obtain a reference angle when the Unbalan...

Page 12: ...ue continuously for a time greater than the applicable time delay setpoint value the appropriate control action is taken The control will lock out the bank if the Gross Over Voltage Level or the Locko...

Page 13: ...rovided in addition to capacitor unit manufacturing tolerance Using the Law of Cosines a corrected magnitude is obtained See Figure 8 A cor rected magnitude is calculated and stored in the control s m...

Page 14: ...g the stored approximate corrected magnitude is subtracted from the real time tap point to ground voltages magnitude in percent during each 200 milliseconds to obtain a compensated neutral to ground v...

Page 15: ...option STEP 3 In the dialog box select the type of report to generate and then click on the OK button There are four types of reports Full Includes all the information contained in the control System...

Page 16: ...program files for this for this type of control The extension CFG is added automatically Note This process does not save the Location setting on the Setup screen or the Communications RTU Address set...

Page 17: ...n the Cancel button to close the Connect dialog box If the IntelliLink software is already run ning choose the Disconnect option from the Connection menu and then choose the Close Screenset option fro...

Page 18: ...reenset from memory STEP 2 FromtheFilemenu choosetheOpenSnapshot option The Open Controller Data File dialog box opens STEP 3 Select the snapshot desired to use and then click on the Open button STEP...

Page 19: ...ndows choose Start menu Programs EnergyLine Update The Update window appears Figure 10 b Select the desired options and then click on the Start Update button Note If the control is not connected to CO...

Reviews: