22
S&C Instruction Sheet 761-505
Installation
(d) In the unlikely event only one or two switch poles
are fully closed, readjust the take-up screw(s) on
the adjustable pipe cou pling(s) at the switch pole
to increase or decrease the effective length(s) of
the inter phase operating pipe(s). See Figure 28.
Take-up
screws
Figure 28. Readjusting the take-up screw(s) on the adjustable
pipe cou pling(s).