Installation and Operation Manual
42
5-9 Setup and test
1 Put a blanking cap on any unused connector on the back of the display unit. Ensure all
connectors are plugged in and the display unit is in place.
2 If the display unit is bracket mounted, adjust tilt and rotation for best viewing and hand
tighten the knob.
3 Install an optional instrument and connect F560 to the optional instrument to make sure that
there is data communication between two devices.
4 At the satellite display, check that it picks up GPS satellites. Wait for the GPS receiver to start
up and the GPS satellite to change to ‘Used in fix’.
Summary of Contents for F560
Page 1: ......
Page 2: ...Installation and Operation Manual 2...