
31
Chapter 6 Installation
6.1 Power supply
You should connect the Processor unit(BNW-51) to the Main power supply(AC 220V) using the AC cable,
and DC cable should be connected to the vessel’s battery(DC24V) which can produce power to the
BNWAS for more than 6 hours.
6.2 Display
You may choose an installation method between bracket mounting and the flush mounting for the
display unit (BNW-50). Connect the display unit (BNW-50) with the processor unit (BNW-51) with cable
(Z8-2M-05) provided.
24
V
GN
D
TX
D
SL
D
RX
D
I N / O U T
1
2
5
4
3
D I S P L A Y
BNW-50 BNW-51
Power connector Interface socket
Display unit (BNW-50)
Processor unit (BNW-51)
Pin number
Color of the cable
(Z8-2M-05)
Interface socket
number
Function
Black (Shield)
1(SLD)
Shield
1
Black (GND)
5(GND)
GND
2
Not in use
-
-
3
White(RS-232 Output)
2(RXD)
RS-232 Input
4
Green(RS-232 Input)
3(TXD)
RS-232 Output
5
Red(DC24 Input)
4(24V)
DC24 Output
6,7,8
Not in use
-
-
Summary of Contents for BNW - 50
Page 2: ...2...
Page 60: ...60 13 11 MOTION SENSOR DND 300M OUTLINE DRAWING 1 3 2 4 A B C D E 122 8 1 5 6 7 8 9 58 1 79 1...
Page 62: ...62...
Page 63: ...63...