
2. Installation : Cable Connections ③ PDS to PDS
• PDS Board to PDS Board (Group2)
- ③
Board ID Setting
: To set IDs for the PDS boards connected to Group1, press the ID switches on the first and last PDS boards and
specify the MODE
.
ZONE
TACT
LED
•
On the first PDS board
, press the Tact switch once to change the state to RED.
•
On the last PDS board
, press the Tact switch twice to change the state to GREEN.
•
The middle PDS boards
do not require separate setting.
(Middle PDS boards: BLUE state by default)
Start Point
Middle
End Point
* PDS Address check
Start
End