43
Y8 port
After installing Y8, the data cable connects the following ports.
•
P8, 10, 16, 20: Connect 16 ports of the total 16 ports
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
2. Installation : Cable Connections ① Y8 to Module
1
2
3
4
5
6
9
10
11
12
13
14
7
8
15
16
【
P8, 10, 16, 20
】
3 x 4 cabinet
Y8 B’d