2. Installation : Overview
16
Unboxing Cabinets & Accessories
Fan Assembly
Handling Cabinets
Mounting Cabinets
Y8/Signal B’d Assembly
Cable Connection
Power Connection
Control Room Setting
Pre-Working Before Cabinet Hang
Accessories Assembly
SW set up
◇
Installation Overview
- The installation follows the below order.
- Prior to the assembly, clearly identify the pre-work.
On-site HW Installation
On-site SW Setup Operation