WEA453e Installation Manual
Version 1.0
Samsung Electronics America
Page
23
of
117
2.3 Carrying and Unpacking
This process outlines how to carry the system and other components to the installation site
and how to unpack them.
2.3.1
Moving the Components
When bringing in the system components, keep in mind the following:
Firmly secure the components in the transporting vehicle and do not exceed the valid
vibration range (1-500 Hz) while transporting the system.
When the operators carry the system components by hand, they must use a cart or a lift
to move the system to the site and also have enough people to carry them.
Clear an adequate space and remove all obstructions before moving the system.
Avoid any physical impact, dust, humidity, or static electricity that may cause any
system damage while moving it.
2.3.2
Unpacking the Components
When unpacking the components, keep in mind the following:
Do not unpack the components until they arrive at the installation site.
Sort the supplies by job specifications and store the components in a safe place where
they will not disturb the installation.
Start installing the system immediately after unpacking the components. If the
installation cannot be completed immediately, store the system at the installation site.
Unpack the external packaging first.
Unpack the internal packaging after arranging the components in their respective
installation positions.
Do not recycle the unused materials. Dispose of the packaging materials in according
with the local waste disposal regulations.