22
/
56
Picture 6-6Take out cabinet Picture 6-7
Press to unfold the automatic
connection corner
3.
Start installing the cabinet. After ensuring that the base beam is flat, gently place
and lock each cabinet. Each time a cabinet is erected, a cabinet is lit immediately to
check if any dead lights, obvious bright lines, and flatness. When a cabinet is stacked
on the other, immediately locked the connecting piece, and connect the cabinet to the
stacking bracket via bracket connector, as shown in Fig. 6-8(1)(2); 2) shown. Plug in
the power cable and signal cable into socket of the cabinet, a
“crispy” sound after
plugging indicates good connection.
Picture 6-8
(
1
)
Rotate the left and right lock levers of the lock cabinet in the direction
of the cabinet mark
Picture 6-8
(
2
)
Bracket Connector
4. Repeat Step 3
,
Until the entire screen is installed. Refer to Chapters 7 and 8 for the steps to debug
the display.