background image

1

 / 

56

 

VMR-I Product Manual 

Summary of Contents for VMR-I HD Series

Page 1: ...1 56 VMR I Product Manual ...

Page 2: ...wer Distribution Cabinet 14 5 5 Other Accessories 17 6 1 Place Installation 18 6 1 1 Preparatory Work 18 6 1 2 Folding bracket installation instruction 18 6 1 3 Cabinet Installation 21 6 1 4 Attention Notes 23 6 2 Hanging 23 6 2 1 Preparatory Work 23 6 2 2 Screen Installation 23 7 2 1 Power Distribution Cabinet 27 7 2 2 Power Cord 27 7 2 3Main Power Cord 27 7 2 4 Display power cord connection 27 7...

Page 3: ... refresh rate high gray level high contrast and seamless matching enable VMR I series to deliver excellent image quality Super Slim Lightweight Design VMR I series has a panel depth of only 86 mm and less than 8 kg panel making it the lightest in its class and ideal for indoor hanging applications Simple Precise Installation Support Snap Locking system with Magnetism Locating System help one perso...

Page 4: ...4 56 1 2 Product Outlook ...

Page 5: ... must be a trained qualified and experienced technician Security tips VMR I HD series are in line with international safety standards and information technology equipment safety standards certified with UL and CE and its parts and components meet safety standards Please pay attention to safety warning signs when using to avoid dangerous situations such as electric shock Warning Please read the ins...

Page 6: ...rts of the cabinet are damaged professional maintenance personnel should be required for maintenance If the power cord in the cabinet is damaged do not try to repair the power cord Please replace the power cord with professional maintenance personnel Moisture proof The maximum relative humidity of the work should be less than 80 Waterproof The VMR I HD series is an indoor product It is absolutely ...

Page 7: ...uch as laser irradiation environment beside the stove The voltage and power of the power supply equipment of the VMR I HD series must meet the requirements When the VMR I HD series products are not used for a long time please cut off the power supply to avoid a safety accident When installing or disassembling the VMR I HD series products pay attention to the corners of the cabinet do not be impact...

Page 8: ...ound easily to sunken is not proper for installation Stacking requirements Samsung Company provides customers with supporting floor stacking brackets to quickly install the display anytime anywhere The floor stand is set in units and multiple sets can be quickly combined to form a large stacking frame 3 2 Electrical Requirement Power supply working voltage is 100 240VAC 50 60HZ main power cable si...

Page 9: ...s of display screen 4 1 Displaying System Connection Diagram 1 Sending box send video data to the display 2 USB serial cable Communicate with computer set the sending box parameters through software 3 DVI line transmit the original video data to the sending box 4 Computer based on the windows system computer set the Sending box parameters play the program 5 Power cord power supply to the display 6...

Page 10: ...hown in Picture 5 1 the VMR I HD series cabinet consists of four modules The cabinet size is 500 500mm and the size of each module is 250 250mm designed with magnetic structure can be quickly disassembled and assembled for front maintenance Picture 5 1 Cabinet Description of the accessories on the cabinet 1 Power cabinet cover contain other components other than modules in the cabinets 2 Truss fix...

Page 11: ...he locking lever quick connection and locking the adjacent cabinet Remark The module housing in the Picture is applicable to VMR I P2 6 VMR I P2 9 VMR I P3 9 Main power cable Power supply to the display the wire diameter is 3 2 5mm2 and the maximum load current is 16A as shown in Picture 5 2 In the Picture 1 is the aviation head connected to the cabinet and 2 is the mains plug We will provide diff...

Page 12: ... is 3 2 5mm2 as shown in Picture 5 4 Picture 5 4 Cabinet Power Line Cabinet signal cable Connects the signal between the cabinet and the cabinet and exceeds the five types of network cables as shown in Picture 5 5 Picture 5 5 Signal cable 5 2 Mounting Accessories 5 2 1 Hanging block Lift the display when lifting as shown in Picture 5 6 ...

Page 13: ...k the locking bars of the two adjacent cabinets 5 2 2 Floor stacking bracket The stacking frame used for stacking can be freely connected to form a large frame to meet the installation requirements as shown in Picture 5 7 Picture 5 7 Foldable Bracket ...

Page 14: ...s customers with standard power distribution cabinets with 8 12 and 16 interfaces It can also customize special power distribution cabinets for customers such as power distribution cabinets with remote power on functions and more interfaces 5 4 Controller System Sending box Receives and processes the DVI video signal and sends the video data to the receiving card through the network cable The fron...

Page 15: ...tly displayed on the display The receiving card complies with the EU RoHS and CE EMC standards as shown in Picture 5 11 Picture 5 11 Receiver Card Control software The control software installed on the computer can set the display parameters display brightness adjustment and other functions The software interface is shown in Picture 5 12 ...

Page 16: ...s shown in Picture 5 13 Different items will choose different types of video processors the appearance and function will be different Picture 5 13 Video Processor HD media player It can play 4K HD video and provide high quality video source for the display The physical object is shown in Picture 5 14 Different items will choose different types of video players the appearance and function will be d...

Page 17: ...l Rolling mask tool As shown in Picture 5 16 when the mask is not flat use this tool to gently roll back and forth on the mask until the mask is flat different point spacing different tools Picture 5 16 Rolling Mask Tool Flight Case According to the customer s requirements the flightcase with waterproof function is specially designed for convenient transportation and convenient loading and unloadi...

Page 18: ...usually adopted The company provides customers with a new floor stand that can be quickly installed The following is the step of quick installation of the new floor stand 6 1 1 Preparatory Work 1 Select the installation area of the VMR I HD display and enclose it with a safety warning band Non workers are not allowed to enter without permission keeping the installation area clean free from dirt an...

Page 19: ...he length as requeste by installation requirements as shown in Picture 6 1 Picture 6 1 Stacking Base Beam Step 2 Install the standing base bar Align the base bar with the base beam as show below Picture 6 2 Picture 6 2 Standing Base Bar Step 3 Install the bracket Assemble the bracket to the base as shown below as shown in Picture 6 3 ...

Page 20: ...he maintenance access board on the bracket as shown below which is convenient for maintenance as shown in Picture 6 4 Picture 6 4 Maintenance Access Board Step 5 Install the bracket connector The height of the connector is determined by the height of the cabinet as shown in Picture 6 5 ...

Page 21: ...off the cabinet from the flightcase in a slowly and gentle way and unwrap the PE package and press the automatic protection angle If the cabinet is not equipped with the automatic corner guard the sheet metal corner can be removed with a screwdriver And place the cabinet completely on the ground or on the desktop as shown in Picture 6 6 6 7 ...

Page 22: ... stacked on the other immediately locked the connecting piece and connect the cabinet to the stacking bracket via bracket connector as shown in Fig 6 8 1 2 2 shown Plug in the power cable and signal cable into socket of the cabinet a crispy sound after plugging indicates good connection Picture 6 8 1 Rotate the left and right lock levers of the lock cabinet in the direction of the cabinet mark Pic...

Page 23: ...t For the VMR I HD Series Samsung provides customers with a truss and FlyKit for quick haing installation The following are detailed steps 6 2 1 Preparatory Work 1 Select the installation area of the VMR I HD display and enclose it with a safety warning band Non workers should not enter without permission keep the installation area clean free from dirt and debris 2 Ensure that you have read unders...

Page 24: ...T according to the position of the upper and lower locking bars of the cabinet as shown in Picture 6 12 Picture 6 12 Hanging Bra Installation 3 Cabinet Installation Picture 6 13 Cabinet Installation 1 First wear anti static gloves and operate with more than one person ...

Page 25: ...h cabinet Each time a cabinet is erected a cabinet is lit immediately to check if any dead lights and obvious bright lines Plug in the power cable and signal cable into socket of the cabinet a crispy sound after plugging indicates good connection Picture 6 16 Lock the cabinets 4 Repeat step 3 Until the entire screen is installed Refer to Chapters 7 and 8 for the steps to debug the display 6 2 3 Pr...

Page 26: ...Note The Seetronic head is used for the 1 4 interface All electrical parameters refer to its specifications power interfaces are strictly differentiated between input and output When cascaded the output interface of the cabinet is connected to the next cabinet input signal interface is the RJ45 interface These two interfaces are independent of input and output After the signal is connected the sys...

Page 27: ... operating voltage range is 100 240VAC indoor single cabinet power consumption is about 160w indoor single cabinet power consumption is about 240W under different input voltage conditions The number of cabinets on a main power cord is different For the specific number please refer to Table 7 1 100 240VAC The indoor single chassis power consumption is about 160w and the indoor single cabinet power ...

Page 28: ...and the display screen to transmit video data with a length of less than 70m Remarks When the transmission distance is greater than 70m it is possible to transmit data by optical fiber and the longest distance is 20 kilometers Signal cascade used for signal transmission between cabinets 7 3 3 Display Signal cable connection 1 Install the sending box arrange the main signal and put it next to the d...

Page 29: ...ignal cable Cabinet signal cable Picture 7 3 Signal connection diagram Product Name Cabinet Qty for 1 main signal cable to carry VMR I P2 6 57 5000pixels 15PCS 17PCS 650000pixels VMR I P2 9 57 5000pixels 20PCS 23PCS 650000pixels VMR I P3 9 57 5000pixels 35PCS 39PCS 650000pixels Remarks The number of pixels carried on each main network cable of the sending box is limited and the actual project shou...

Page 30: ...e Double click to open the NovaLCT Mars software as shown in Picture 8 10 click User Advanced Login to open the software setting interface as shown in Picture 8 10 Picture 8 10 A password window pops up as shown in Picture 8 11 Enter the password 666 to pop up the parameter setting window as shown in Picture 8 11 Click the Confirm button on the Screen Config interface as shown in Picture 8 12 Pict...

Page 31: ...d files button on the Scan Board interface load the RCFG file corresponding to the display and then click the Send to HW button After the display shows normal click Save as shown in Picture 8 12 Picture 8 13 Picture 8 12 ...

Page 32: ...reloaded and sent to the receiving card After sending and saving the configuration file the display should display the same content in units of the cabinet To load the screen file 8 1 2 Screen connection file loading Click Read file in the Screen connection interface of the software parameter settings Button load the SCR file then click the Send to HW button After the display shows normal click Sa...

Page 33: ...le needs to be reloaded and sent to the receiving card At this point the entire screen connection parameter setting has been completed At this time the entire screen should be displayed on the desktop of the computer Next you can play the program you want in the initial interface of NovaLCT Mars For details please refer to the software manual It can be seen in the Help submenu under the software i...

Page 34: ...34 56 Appendix A Dimensional Drawing of Main Components A 1 VMR I HD series cabinet size chart VMR I P2 6 VMR I P2 9 ...

Page 35: ...35 56 VMR I P3 9 A 2 Flykit ...

Page 36: ...els panel 16 384 pixels panel LED Module Dimensions mm 250 250 250 250 250 250 Panel Dimensions W H D mm 500 500 86 500 500 86 500 500 86 No of Modules Per Panel W H 2 2 2 2 2 2 Physical Resolution of Module W H 96 96 84 84 64 64 Physical Resolution of Panel W H 192 192 168 168 128 128 Weight Per Panel 8 0 0 3 kg panel 7 6 0 3 kg panel 7 4 0 3 kg panel Weight Per m 32 1 2 kg m 30 4 1 2kg m 29 6 1 ...

Page 37: ... Consumption 192 w sqm 192 w sqm 192 w sqm Max Power Consumption 640 w sqm 640 w sqm 640 w sqm Operating Temp Humidity 10 40 10 80 10 40 10 80 10 40 10 80 Storage Temp Humidity 20 60 10 90 20 60 10 90 20 60 10 90 Expected LED Lifetime Max 100 000 Hrs 100 000 Hrs 100 000 Hrs Certification Certification Power Max Power Consumption w m2 640 640 640 Max Power Consumption w Cabinet 160 160 160 Typical ...

Page 38: ... cabinets 9 Left and right signal cables between cabinets 10 Upper and lower signal cables between cabinets 11 Main power cord 12 Main signal cable 13 Connection piece and screw between cabinets 14 Power aviation head 15 Signal aviation head ...

Page 39: ...39 56 Appendix C Tools to be prepared C 1 Adjustable Wrench conventional C 2 Screwdriver medium size C 3 Cutting pliers conventional ...

Page 40: ...40 56 C 4 Allen key M3 is used to open the power cabinet M8 is used to fix the connecting piece C 5 Plastic hammer ...

Page 41: ...of the module to be removed and press it slightly on the surface of the module so that the suction cup of the suction tool fits evenly with the module surface as shown in the following Picture D 2 Press and hold the air suction tool switch for 3 5 seconds and the air suction tool sucks the module ...

Page 42: ...wn below D 4 After removing the module release the air suction tool switch and the module is successfully removed as shown below Remarks The VMR I HD series is a small pitch product that is very easy to damage All the actions need to be handled gently during the process of disassembling the module ...

Page 43: ...43 56 Appendix E How to use the upper and lower lock levers E 1 2 Push the lock lever up as shown below E 1 3 The lock lever is pushed up into position and the lock bar lock lever is as shown below ...

Page 44: ...gainst the cabinet as shown below E 1 5 Locking status as shown below E 1 6 Locate the left and right locks and unlock them Turn the lock lever handle according to the UNLOCK direction of the cabinet to the point where it cannot be rotated Then push the lock piece pointed by the arrow to unlock it as shown below ...

Page 45: ...When the cabinet is installed the position of the upper right lock lever is as shown below E 2 2 Push the lock lever up as shown below E 2 3 The lock lever is pushed up into position and the lock bar lock lever is as shown below ...

Page 46: ...46 56 E 2 4 Move the handle to the inside of the cabinet arrow to press the handle to the cabinet as shown below E 2 5 The locking state is as follows ...

Page 47: ...abinet to the point where it cannot be rotated Then push the lock piece pointed by the arrow to unlock it as shown below Appendix F How to use the left and right angle locks F1 Initial state The initial state of the angle lock is as shown in the Picture below Adjust the position as shown in the Picture below to the desired angle ...

Page 48: ... adjusted to the required scale press the handle to press the handle and lock the angle to the desired angle as shown below F3 Align the left and right cabinets together as shown below F4 Push the lock lever to the left as shown below ...

Page 49: ...49 56 F5 Turn the lock lever 90 clockwise as shown below F6 The position of the lock lever is as shown below as shown below ...

Page 50: ...50 56 F7 Turn the lock lever handle according to the mark on the cabinet as shown below F8 Press the lock handle according to the mark to lock the cabinet as shown below ...

Page 51: ... the M3 Allen key to turn the fuse button in the direction of the mark as shown below G2 Press the four buckles shown below and open them as shown below G3 Hold both ends of the power cabinet with both hands and pull the power cabinet backwards as shown below ...

Page 52: ...52 56 G4 Open the back cover of the power supply cabinet as shown below as shown below ...

Page 53: ...wered As shown in Picture 1 below Picture 1 2 Check the DVI line and check if the network cable is in good contact As shown in Picture 2 below 3 The sync screen detects whether the green light of the sending card and the receiving card is blinking As shown in Picture 2 below Picture 2 4 Check for copy mode As shown in Picture 3 ...

Page 54: ...t illuminate and the LED itself is damaged resulting in a dead light As shown in Picture 4 Picture 4 2 A string of lights is not lit or constantly lit and one of the 16 bit pins of the constant current IC is damaged or soldered As shown in Picture 5 Picture 5 ...

Page 55: ...dule may be loose and cannot be powered As shown in Picture 7 Picture 7 5 If one or several lines of the module are not lit the tube may be damaged If the module shows a lack of color it may be 245 soldered or damaged Then check whether the indicator on the back of the cabinet is abnormal check the HUB board or upgrade or replace the receiving card As shown in Picture 1 above ...

Page 56: ...56 56 Picture 1 ...

Reviews: