Samsung Electronics
3-5
Operating Instructions and Installation
3-2-2 Installation diagram of indoor unit and outdoor unit
A
Indoor unit gas leak test check point
Tape vinyl
Piping
Indoor unit
B
Drain hose installation
Cut the piping hole
sloped slightly
Piping (Liquid) 1/4"
Clamper tube
Installation plate
Installation tube
Pipe-connection
Vinyl tape
Screw
Putty
Drain hose
Piping may be laid to the rear, left,
right or down .
Right
Rear
Down
250mm
or more
200mm or more
Rear
Left
3
2
5
6
4
10
1
2
3
4
5
6
7
8
9
10
1
Remote control
Remote control holder
7K/9K BTU Piping(Gas)3/8”
12K BTU Piping(Gas)1/2”
Summary of Contents for US07A1VE
Page 2: ... Samsung Electronics Co Ltd FEB 1997 Printed in Korea Code No DB81 10122A 1 ...
Page 4: ...1 2 Samsung Electronics MEMO ...
Page 27: ...Samsung Electronics 3 14 MEMO ...
Page 42: ...Samsung Electronics 6 1 6 Exploded Views and Parts List 6 1 Indoor Unit ...
Page 44: ...Samsung Electronics 6 3 6 2 Outdoor Unit 24 1 24 25 25 2 25 1 25 3 25 4 25 5 18 18 1 19 ...
Page 48: ...6 7 Samsung Electronics MEMO ...
Page 50: ...Samsung Electronics 8 1 8 PCB Diagrams 8 1 a Main PCB 7000Btu DB93 10483A ...
Page 52: ...Samsung Electronics 8 3 8 1 b Main PCB 9000 12000Btu 12000BUT DB93 10471A 9000BUT DB93 10485A ...
Page 55: ...Samsung Electronics 9 1 9 Wiring Diagrams 9 1 Indoor Unit ...
Page 57: ...Samsung Electronics MEMO ...
Page 58: ...Samsung Electronics MEMO ...
Page 59: ...10 1 10 Schematic Diagrams 10 1 Indoor Unit Samsung Electronics ...
Page 60: ...Samsung Electronics 10 2 10 2 Remote Control ...