CHAPTER 2. Pre-Installation Requirements
2-4
© SAMSUNG Electronics Co., Ltd.
Required Tools and Materials
You need the following tools and equipments to install and upgrade the router
and its components.
Cables
To prepare for router or component installation, ensure that you have all
required cables and wires. The console port cable is provided with the router.
For more information on cable specifications, see Annex B.
Console port cable (for a terminal connection)
Ethernet 10/100Base-T CAT-5 UTP cable (for a LAN connection)
Tools
To unpack the router and prepare for installation, you need the following tools:
Number 2 Phillips screwdriver-to attach the rack-mounting brackets to
Ubigate iBG1003.
Number 3 Phillips screwdriver-to attach the Ubigate iBG1003 to the
equipment rack.
Small flat-blade screwdrivers-to install ground and an external alarm.
Materials
The following additional materials are required to install the router:
18-22 AWG wire (for alarm and ground connections)
Fasteners (for rack mounting)
Summary of Contents for Ubigate iBG1003
Page 1: ......
Page 12: ...GENERAL USER INFORMATION X SAMSUNG Electronics Co Ltd This page is intentionally left blank...
Page 16: ...INTRODUCTION XIV SAMSUNG Electronics Co Ltd This page is intentionally left blank...
Page 20: ...SAFETY CONCERNS XVIII SAMSUNG Electronics Co Ltd This page is intentionally left blank...
Page 72: ......