47
PART V
Changing Jobs
SM421 Operation Handbook
PART V. Changing Jobs
4. L
oading the PCB file
6. Adjusting the conveyor width
3. Clean the feeder base
5. Remove backup-pin
Load a new PCB file. For more details, refer to 'Loading
the PCB file' of 'PART III. Production'.
Adjust the conveyor width according to the new PCB. For
more details, refer to 'Adjusting the conveyor width' of
'PART III. Production'.
Remove the chips or other foreign matter on the feeder base
upper surface and in the slot by using the provided brush or
another small brush.
Before removing the backup-pin, power off the
motor.
Warning