Confidential and proprietary-the contents in this service guide subject to change without prior notice
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
7. Level 2 Repair
7-5. Assembly
※
Caution
Be care of SPK damage.
※
Caution
Be care of Sub PBA damage.
※
Caution
Please keep the guide line for C to C FPCB and BLACK,
WHITE COAXIAL CABLE.
※
Caution
1) Be care of scratch CAM lens
2) Be care of damage each part.
Attach Motor and Receiver in upper area.
1
Attach SPK on Rear Ass’y.
2
Attach Sub PBA and HB PBA on Front Ass’y.
3
Attach RF Cable 2ea and FPCB 2ea,
fingersensor Screw 2ea & FPCB.
Screw insertion 2 Point.
* Torque Value : 0.95
4