99
CHECK THE INSTALLATION STATUS
This document cannot be used without Samsung's authorization.
1. Please shut the water supplying prior to repair.
2. Power is applied to the one end of wires. Be careful when disassembling not to get an electric shock.
PIN Number
Start
Is the confirming
sound of the valve operation heard when
Ice maker test switch pushed?
Does Main PCB IC01
MICOM #90 voltage change
5V/0V?
Does Main PCB MIC01
MICOM #58 voltage have
high(5V) output?
Does Main PCB
Q719 have about 0.7V
output?
Is the contact
point of main PCB RELAY RY74
normal?
MAIN PCB normal
- Need to check the other parts
①
Check the wire between Ice water valve
↔
MAIN PCB
②
Ice water valve itself has trouble or bad contact of connector.
③
Check the connection hose.
Normal
(Check Ice water valve hose.)
Check soldering
short/Replace PCB.
Check soldering
short/Replace PCB.
Check soldering
short/Replace PCB.
Check soldering
short/Replace PCB.
NO
YES
YES
NO
NO
NO
NO
YES
YES
YES
6-10) If ICE Water is not supplied (OPTION)
☞
Checking method of voltage Based on
1) Check the voltage of MIC #58
↔
CN04 #2 - ICE Water valve waiting (about 0V)
2) Q719
↔
CN04 #2
- ICE Water valve Waiting (about 12V±0.8V)
- ICE Water valve Operating (about 0.7V±0.5V)
3) Check the voltage of Water Valve operating
(AC voltage)
⇒
The Relay RY74 operating.CN71 -"7
↔
CN70-"1"
- ICE Water valve waiting (about AC 0V)