16
Test operation
Check if the total value displayed on the power distribution
unit is the same as the digital electric meter's.
4
Check the communication status by pressing the
or button after completing all the settings for
the communication protocol.
Check if the LCD display turns on after powering on the
power distribution unit.
1
Set the communication protocol between the digital electric
meter and the power distribution unit.
2
3
Mode
Room
Total
KWH
KWH