Samsung Electronics
2. Preparation for Cabinet Installation
⑧
Attach the PET Sheet and assemble Cover PCB for the Cabinet that is located at the
exterior.
※
PET Sheet & Cover PCB should be at the boundary of whole screen.
(Blue area at the exterior of Fig.1)
※
Attach PET Sheet as shown below.(Fig.3), The areas where there is no tape should guide the LED module.
※
Assemble the Cover PCB as shown below.(Fig.4)
Fig.1 Sheet PET/ Cover PCB
Fig.3
Fig.4
PET-Sheet
No Tape
0~0.5mm
8
Fig.1 Attach point of
Sheet PET
Fig.1 Attach point of
Sheet PET