Samsung Electronics
3. Frame Installation
①
Put the
ⓐ
Bracket Side the end of the left side and then fasten the screws to install.
(Fig.3)
※
After fastening one(1) screw, use the device for vertical positioning to set up straight vertical alignment. Then fasten up the remaining
holes. (
Refer to Page 11
for the Precautions for fixing the Screws)
Order of Fastening the Screws (No. 1
→ No. 2 → No. 3 → No. 4). (Fig.1)
ⓐ
Bracket Side is located at 7mm of the end line of the screen. (Fig.4)
Fastened
Hole
Reserved
hole
No. 1
Fig.1 (Order of Work)
No. 2
No. 3
No. 4
Fig.2(Reserved Holes)
a
a
b
b
b
b
b
c
Fig.3 (Location of Components)
10
Fig.4 (Distance between
Screen and Bracket side)
Min. 12mm
Min. 25mm
Min. 12mm
a