Samsung Electronics
2. Preparation for Cabinet Installation
Fig.1 Box Opening
• Preparations Before Installation
handle
Push
Hook Area
Top-Cushion
IB & cable
Bottom-Cushion
LED set
Box
Fig. 2 Handle
Fig.4 Bolt Assembly
Fig.3 Cover Connector
Removal
SLIDING SCREW
(In Exclusive Frame Accessory)
9 Page -
ⓓ
Outermost Hole
①
Remove the Box tape at the upper area and then open up the box.
(Fig.1)
②
Remove the Top
–Cushion and hold the handle inside PE-Bag and pull out the set then remove PE bag.
(Fig.2)
③
Press the hook area and then bend backwards to separate the Cover-Connector.
(Fig.3)
④
Assemble four(4) Sliding Screw for installation at the hole located at the outermost part of the Corner.
(Fig.4)
5