ELECTRICAL WORK
The electrical work should be performed by a specialist qualified for the work.
◆
Use the three phase power supply, and be sure to install the sub power distributing board for
exclusive use with the unit(separately purchased by the user).
❈
Do not connect multiple plugs to an outlet at once because it can cause a drop in voltage,
resulting in poor performance of the automatic control circuit.
◆
Be sure to install circuit breaker (Extra purchased by the user).
◆
Be sure to connect the grounding wire.
Model
Power
Ampere of breaker
Knife switch
Size of grounding wire
Min. size of electric wires from/to
the indoor/outdoor unit
Size of electric input wires
Switch
Fuse
APV48Q0AN
1ø, 208~230V, 60Hz
50 A
30 A
30 A
2.0mm
2
0.75mm
2
4mm
2
❏
Electric power specification
CAUTION
◆
Be sure to use the wires, and switches or fuses of power distribution board are qualified and fulfill
the specifications.
◆
Be sure to install knife switch or circuit breaker on the power distribution board.
◆
The electrical and grounding work should be performed as per ‘technical specifications of
electrical facilities’ and ‘specifications of internal wiring’.
◆
Be sure to connect the main electrical input wires with bolted connectors using compressed terminal.