E-
14
CHECK AND TEST OPERATION
Check
◆
Be sure to check the following again after completion of installation.
1. Check the piping connection area for any gas leakage.
2. Is the drain hose properly connected?
3. Is the insulation of the piping in good condition?
4. Is grounding properly made?
Insulation
Indoor
connection area
Outdoor
connection area
Indoor and
outdoor unit connection
Drain hose
APV48QOAN_E_IM_00000 2008.10.20 11:5 PM Page 14
Air Marketing Group LLC
141 Kinderkamack Rd, Park Ridge, NJ 07656 Tel: 201-782-1782 Fax: 201-782-1783 Web: www.amgair.com Email: [email protected]