Category
Check Item
Detailed Contents
Check Result
Specifications
Installation Checklist
Installation Checklist
g y
p
Strainer
Mesh size
( ) mesh
50 mesh or higher should be used.
Is the strainer installed in the proper location and
direction?
Yes ( ) , No ( )
Install the strainer at the inlet of the hydro unit.
Air vent
Is the air vent installed at the top of the pipe?
Yes ( ) , No ( )
Install the air vent at the highest point of the pipe.
Drain valve
Is the drain valve installed?
Yes( ) , No ( )
Install a 15A or higher valve at the inlet of the hydro
unit (at the lowest part)
Shut off valve
Are the inlet and outlet shut off valves installed?
Yes( ) No ( )
Install the inlet and outlet shut off valves
Water part
Shut-off valve
Are the inlet and outlet shut-off valves installed?
Yes( ) , No ( )
Install the inlet and outlet shut-off valves.
Expansion tank
What type of the expansion tank is installed?
Closed type ( ) , Open type ( )
Closed expansion tank
Where is the expansion tank installed?
Upper part of the boiler (heat storage tank)
(It is generally applied. Only if there is as tank, the
location is not a problem.)
Pipe insulation
Is the insulation material for water pipes properly
Type of the insulation material ( )
Use PE, Heatron, EPDM or NBR material.
Use 19T for 80A or lower and use 25T for 100A and
higher
Pipe insulation
installed according to the specification.
Thickness ( )
higher.
However, if there is a separate site facility specification,
use the seperate site facility specifactions..
Leakage check
Are there any leaks?
Yes ( ) , No ( )
Check if there are no leaks using 1.5 times the
pressure of the standard operating pressure for 3 hours
(if there is no standard of operating pressure, test
using a pressure of 7kgf/cm2)
Check if the pump works properly
Circulation pump
Does the circulation pump work properly?
Yes ( ) , No ( )
Check if the pump works properly.
(Check if water can pass and there are no abnormal
noises. Check the flow switch meter.)
Are the thickness and length of the power cable
appropriate?
Thickness ( )
㎟
Length ( )m
1) Power cable: Use H05RN-F / H07RN-F or higher.
2) Single phase model: Length of the power cable ≤
10m - 4.0
㎟
10m < Length of the cable < 20m - 6.0
㎟
Fix the power cable with the conduit of the Control
Electricity
Electric work
Is the cable properly tied with the cable tie?
Yes ( ) , No ( )
Fix the power cable with the conduit of the Control
Box or the cable tie.
(The midnight and normal power cables should be
firmly fixed.)
Type of conduit
Class 1flexible metal conduit( )
Flexible metal conduit covered with PVC ( )
Apply the class 1 flexible metal conduit or flexible
metal conduit with PVC to the midnight and the
normal power cables
Apply the tightening torque to fasten the ring terminal
Are ring terminals used
to connect the terminal block.
Yes ( ) , No ( )
Apply the tightening torque to fasten the ring terminal
(as shown in the installation manual)
* M3 (communication cable F1, F2) - 0.58 N·m
* M4 (3-phase power cable) - 2.94 N·m
* M5(single-phase power cable) - 4.9 N·m
If an error occurs,
(check the display
panels of the indoor
There should be no error or an appropriate measure
should be taken
Other
panels of the indoor
unit main PCB and
the wired remote
control.)
Records the errors and measures taken
should be taken.
E.g. E606 error occurred. The communication cable
has been reconnected.
Differences from the
standard drawing
Record differences
Summary of Contents for AM160FNBFEB/EU
Page 7: ...1 Product Overview and Features 1 Product Overview and Features Operating Range Hydro unit ...
Page 13: ...2 Product Structure 2 Product Structure ...
Page 14: ...2 Product Structure 2 Product Structure DVM Hydro Unit HT DVM Hydro Unit HT ...
Page 23: ...4 Disassembly and Reassembly 4 Disassembly and Reassembly ...
Page 24: ...4 Disassembly and Reassembly 4 Disassembly and Reassembly ...
Page 25: ...4 Disassembly and Reassembly 4 Disassembly and Reassembly ...
Page 26: ...4 Disassembly and Reassembly 4 Disassembly and Reassembly ...
Page 27: ...4 Disassembly and Reassembly 4 Disassembly and Reassembly ...
Page 28: ...5 Planar Figure and Parts List 5 Planar Figure and Parts List Parts List ...
Page 29: ...5 Planar Figure and Parts List 5 Planar Figure and Parts List Parts List ...
Page 30: ...5 Planar Figure and Parts List 5 Planar Figure and Parts List Parts List ...
Page 33: ......
Page 34: ...6 Installation and Service Precautions 6 Installation and Service Precautions ...
Page 35: ...6 Installation and Service Precautions 6 Installation and Service Precautions ...
Page 36: ......
Page 37: ...6 Installation and Service Precautions 6 Installation and Service Precautions ...
Page 38: ...6 Installation and Service Precautions 6 Installation and Service Precautions ...
Page 39: ...6 Installation and Service Precautions 6 Installation and Service Precautions ...
Page 46: ...7 Circuits 7 Circuits Control Box Parts Layout Drawing of C BOX Picture of C BOX ...
Page 50: ...7 Circuits 7 Circuits Connecting External Contacts Hydro Unit Hydro Unit HT ...
Page 51: ...7 Circuits 7 Circuits Connecting External Contacts ...
Page 52: ...7 Circuits 7 Circuits Connecting External Contacts ...
Page 56: ... Switch and Error Codes 7 Circuits 7 Circuits Switch and Error Codes ...
Page 57: ... Switch and Error Codes 7 Circuits 7 Circuits Switch and Error Codes ...
Page 60: ...d 9 Troubleshooting 9 Troubleshooting Error Codes ...
Page 61: ...9 Troubleshooting 9 Troubleshooting d Error Codes ...
Page 62: ...9 Troubleshooting 9 Troubleshooting d Error Codes ...
Page 73: ... Wired Remote Control for Installation Service mode ...