12
Installation Procedure
English
Instal
lation Pr
oc
edur
e
AC035RNMDKG, AC052RNMDKG, AC071RNMDKG
(Unit: mm)
700
700(7x100)
817
850
22-ø3.2
900
604
700
500
850
950
185
158
28
220
180(2x90)
250
213
125
323
06
07
05
01
02
04
03
(Air outlet duct flange)
(S
uspe
nsion
position
)
Discharge side
Suction side
(Suspension position)
Inspection hole
hole
(Air around)
No.
Name
Description
01
Liquid pipe connection
Ø6.35(1/4")
02
Gas pipe connection
**035**: Ø9.52(3/8"); **052**: Ø12.70(1/2")
**071**: Ø15.88(5/8")
03
Drain pipe connection
OD25 ID20(without drain pump)
04
Power supply connection
05
Air discharge flange
06
Air filter
07
Hook
M8~M10