EB 8084 EN
5-5
Installation
1.
Close the shut-off valves in the pipeline
at the inlet and outlet of the plant section
while the valve is being installed.
2. Prepare the relevant section of the pipe-
line for installing the components.
3. Remove any protective caps before in-
stalling the components.
4. Lift the silencer using suitable lifting
equipment to the site of installation (see
information under 'Lifting the silencer' in
the 'Shipment and on-site transport' sec-
tion). Pay attention to the directions of
flow for the silencer and valve before lift
-
ing. Both directional arrows must point in
the same direction.
5.
Use the correct flange gaskets.
6. Install the valve and silencer free of
stress. Observe specified tightening
torques.
Versions with welding ends:
weld the
valve and silencer free of stress into the
pipeline.
7. Attach a support or suspension on the
valve, if necessary.
Attenuation
plate
Flange
Valve outlet
Flange
Pipeline
Gasket
Gasket
Fig. 5-5:
Valve flange and pipe flange, with
Type 3381‑1 Silencer inbetween
b) Type 3381-3-X
See Fig. 5-6
Gasket
Housing
Attenuation plate
Studs
Gasket
Studs
On the
valve
side
On the
pipeline
side
Fig. 5-6:
Type 3381‑3‑2 Silencer before instal
-
lation
Removing the studs
Î
Before mounting the silencer onto the
valve and installing it into the pipeline,
Summary of Contents for 3381 Series
Page 12: ...2 2 EB 8084 EN ...
Page 21: ...EB 8084 EN 4 5 Shipment and on site transport Mid axis Fig 4 2 Type 3381 3 X with valve ...
Page 32: ...5 10 EB 8084 EN ...
Page 34: ...6 2 EB 8084 EN ...
Page 36: ...7 2 EB 8084 EN ...
Page 38: ...8 2 EB 8084 EN ...
Page 40: ...9 2 EB 8084 EN ...
Page 42: ...10 2 EB 8084 EN ...
Page 44: ...11 2 EB 8084 EN ...
Page 45: ......
Page 46: ......
Page 47: ......