background image

 

 

 

 

 

  S

AMS

G

AZEBOS

TM

 

 

10’ Octagon Gazebo #A single-ered roof for an uneven pao  

 

Assembly Instrucons 

 

 

 

 

 

 

 

 

 

 

 

10-OCT-A-CUPOLA 

10-OCT-A 

 

 

 

 

S

AMS

G

AZEBOS.COM, INC.

 

 

 

 

132 E. 163rd Street, Gardena, CA 90248

 

 

 

 

Customer Service: (800) 376-7267    [email protected] 

 

 

 

Monday ~ Friday: 8:00~ 6:00, Saturday: 10:00 ~ 4:00 (Pacific Standard Time)

 

Summary of Contents for 10-OCT-A

Page 1: ...red roof for an uneven pa o Assembly Instruc ons 10 OCT A CUPOLA 10 OCT A SAMSGAZEBOS COM INC 132 E 163rd Street Gardena CA 90248 Customer Service 800 376 7267 info samsgazebos com Monday Friday 8 00 6 00 Saturday 10 00 4 00 Pacific Standard Time ...

Page 2: ...any parts are missing or you have any ques ons please contact Customer Service at 800 376 7267 2 Lay out the parts in separate staging area We recommend you set aside the same parts together while you go through the list this step will save you me and effort during assembly 3 Select a loca on for your gazebo Choose any area of your hard surfaced pa o or cement pad Trim down overhanging trees and av...

Page 3: ...le ered roof List of Parts 8 Headers 8 Posts 1 standard and 7 longer 8 RaFers 8 Post Bases One is aGached to the standard post 8 Upper Roof Panels 8 Lower Roof Panels Standard Post Longer Post This is line 1 standard post length ...

Page 4: ...4 16 Corbels 5 Rails 5 Top Rails 8 Temporary Post Holders 2 Wood Pieces 1 small and 1 large 1 small 4x4 for leveling 8 3 8 Hanger Bolts with Washers Nuts Rail Top Rail 2 Temporary Rail Holders ...

Page 5: ... the header connectors Large for every where else 8 3 8 Lag Bolts Washers 8 3 8 Wedge Anchors Screws 16 Small for the boGom of the lower roof panels Large for everywhere else 8 Header Connectors 1 Cupola op onal Not included in 10 oct A model ...

Page 6: ...ebo has three entrances Rotate them to your liking 3 Fasten each of the headers together with large nails ONLY half way 5 Repeat steps 3 and 4 for the remaining seven corners 6 Measure the inside headers to make sure the eight headers form a perfect octagon Adjust the header posi ons un l the distances are all the same for op mal results This is a template for post posi ons Rotate it to face your ...

Page 7: ...mall 4 x 4 around the center of the headers and trace it with a pencil This should NOT be removed during the leveling 11 Check the level and mark the leveled horizontal line for each corner 12 Con nue to level un l you have eight lines Label the lowest line as 1 Your lines may look much closer than this example if your pa o is almost level 1 Taping your level to the longer piece is recommended Ple...

Page 8: ...ng a square extend the line you marked as 1 around the perimeter of the wood you have been marking in steps 12 13 1 1 1 16 Label the headers the corners of the pa o 1 to avoid mistakes or confusion Put standard post 1 next to them 1 17 Go to the next corner Flip the leveling wood piece to the other side to avoid confusion mark the level and label it 2 18 The line 2 and the other lines should be ma...

Page 9: ...of the post using a square This is the line you will need to cut 22 If you are using a circular saw cut the post from side to side then rotate and proceed to cut through the post in this fashion 23 AGach the post base to the boGom of the post Align the outsides and the four corners 24 Fasten the post base to the boGom of the post with large screws U P Post The other posts should be LONGER than the...

Page 10: ...cement to mark for the post base 27 A good way to keep tack of marks is to rotate the leveling wood piece as you level 28 Now the seven posts are adjusted the post bases are fastened and ready to install 30 Repeat step 29 for the other seven posts Put your both feet on the headers while you are drilling Do NOT move the headers Your lines may look different depending on a slope of your pa o However ...

Page 11: ...s with the inside corners tracing of the headers drawn in steps 7 and 8 34 Sweep the dust away again 33 Drill 1 1 2 deep where you previously drilled in step 29 The line should be directly over the drilled holes 36 Repeat step 35 for the rest of the corners This will keep you align the posts again later 32 Sweep the dust away from drilling the holes ...

Page 12: ...r approximately 1 1 2 deep where you marked 38 Let the bolt of the post base slip into the hole 39 Align the diagonal pencil line to the center of the post base Inside Outside Outside 40 Temporarily aGach an L post connector to the post and mark for a wedge anchor 42 Put the post and the L post connector back where they were and drill a 1 8 3 16 hole for a 3 8 lag bolt Outside ...

Page 13: ...e wedge anchor with a socket wrench Temporary Post Holder Rail 44 Insert a wedge anchor into the newly drilled hole and hammer it in 46 Go to the next post and repeat steps 38 45 Put a tem porary post holder between posts as you go to the next post 48 Install the rails as you install posts Use your foot to hold the rail in place as you proceed to step 49 Socket Wrench ...

Page 14: ... with a large screw as shown above 52 Fasten the rail again but this me to the lower end Repeat this process on the other side of the rail 53 Fasten a top rail to the posts with large screws Header Post Remove the washers and nuts from the hanger bolt and set them aside for later use 54 Now remove the temporary post holders and place the headers on top one at a me Top Rail Outside Outside Outside ...

Page 15: ...s with a large screw 57 Fasten down the headers with the washers and nuts 58 Fasten each header to a post with large screws 59 Fasten a header connector to each corner with small nails Repeat this process with each corner Ra er 60 Install the raFers on the ends one at a me by loosely puOng them over the fiOngs as above Outside Inside Outside ...

Page 16: ... the raFer top posi ons up or down as you install raFers Ra ers 64 As you do this fasten the raFer tops with large nails Coun tersink the large nails for a perfect fit 65 Fasten the raFer end from both sides with large screws 66 Repeat steps 60 65 as you add more raFers Adjust the raFer top posi ons up or down as you align the raFer tops ...

Page 17: ...en the roof ends with small screws 70 Gently hammer the roof ends if there are gaps in between the roof panels 72 Once you are complete with the lower panels install the upper roof panels with the smoother side facing inwards Top View 67 Upon complete installa on of the raFers they should form a perfect octagon as seen above Interior View ...

Page 18: ...ails from the headers from step 55 75 Fasten an op onal cupola with large screws aFer installing a roofing material of your choice The heavier look ing sides should be at the boGom 73 Fasten the upper roof panels and the lower roof panels to the raFers with nails 76 Finish ...

Reviews: