- 57 -
SR 1046PRO
40
41
instruction manual
H
arv es t er
2/2012
S e r v i c e m e a s u r e s
every 1 000 hours
1. All service measures to be performed
daily, weekly and every 100 and 500 hours
The service to be performed every 1 000 hours
includes all the service measures listed under
service measures daily or every 8 hours,
service measures weekly or every 50 hours
and service measures every 100 and service
measures every 500 hours.
2. Changing of the fuel filter
See instructions in the Engine Manual, fig.
40.
3. Draining of condensed water out of the
fuel tank
Run a little fuel from the filler at the front of
the fuel tank into a pan.
4. Changing of the oil in the crane turning
motor
The oil in the turning motor (fig.41) is changed
every 1000 hours. However, the first time the
oil is changed after 50 hours. See further
instructions in the crane manual.
Refill in accordance with the oil table.
A Fillling opening
B Control opening
C Drain opening
5. Changing of the hydraulic oil filter
Change the filters in the working and traction
hydraulics (fig. 42).
A Return filter
B Breather
C Pressure filter
D Suction filter
5. Replacing Of The Hydraulic Oil Filters
For more information on filter replacement, see items Service Measures Every 1000 Hours.
6. Checking Of Screw Tightness After The First 500 Operating Hours
Screw tightness in the crane and joint shall be checked after the first 500 operating hours.
Torque for the crane M24x2 screws in strength class 10.9 is 1000Nm and in strength class 12.9
1200Nm.
Torque for the M10 screws in the joint (strength class 10.9) is 68Nm, for the M16 screws (strength
class 10.9) torque is 300Nm, and for the M20 low-headed screws (strength class 10.9) 550Nm,
and for ordinary hexagonal socket-head screws 700Nm (strength class 12.9).
7.
Adjusting the diesel engine valves
Adjust the diesel engine valves after the first 500 operating hours and then every 1000 opera-
ting hours.
For detailed information, see the engine manual.
Summary of Contents for SR1046PRO
Page 2: ......
Page 29: ...29 SR1046PRO 13a instruction manual Harvester 2 2012...
Page 69: ...69 SR1046PRO instruction manual Harvester 2 2012 Hydraulic diagram...
Page 70: ...70 SR1046PRO instruction manual Harvester 2 2012 Hydraulic diagram part catalogue SR1046 pro...
Page 71: ...71 SR1046PRO instruction manual Harvester 2 2012 Electric diagram...
Page 72: ...72 SR1046PRO instruction manual Harvester 2 2012...
Page 73: ...73 SR1046PRO instruction manual Harvester 2 2012...
Page 74: ...74 SR1046PRO instruction manual Harvester 2 2012...
Page 75: ...75 SR1046PRO instruction manual Harvester 2 2012...
Page 76: ...76 SR1046PRO instruction manual Harvester 2 2012...
Page 77: ...77 SR1046PRO instruction manual Harvester 2 2012...
Page 78: ...78 SR1046PRO instruction manual Harvester 2 2012...
Page 79: ...79 SR1046PRO instruction manual Harvester 2 2012...
Page 80: ...80 SR1046PRO instruction manual Harvester 2 2012...
Page 81: ...81 SR1046PRO instruction manual Harvester 2 2012...
Page 82: ...82 SR1046PRO instruction manual Harvester 2 2012...
Page 83: ...83 SR1046PRO instruction manual Harvester 2 2012...
Page 84: ...84 SR1046PRO instruction manual Harvester 2 2012...
Page 85: ...85 SR1046PRO instruction manual Harvester 2 2012...
Page 86: ...86 SR1046PRO instruction manual Harvester 2 2012...
Page 87: ...87 SR1046PRO instruction manual Harvester 2 2012...
Page 100: ...100 SR1046PRO instruction manual Harvester 2 2012...
Page 101: ...101 SR1046PRO instruction manual Harvester 2 2012...