8. PROBLEMS, CAUSES AND REMEDIES
7. MAINTENANCE
The system must be switched off for all maintenance and
repair work and secured against unauthorised operation.
If the switchgear is used in sewage lifting systems, maintenance must
be carried out by qualified personnel according to EN 12056-4.
The maintenance intervals must not exceed :
- 3 months for commercial operations.
- 6 months for units in apartment building.
- 1 year for units in single houses.
- Perform visual inspection of the electrical part.
- The operator is responsible for ensuring that inspection and assem-
bly are carried out by authorised and qualified personnel who have
studied the operating instructions closely.
N°
Problems
Fault signal
Cause / Remedy
Operating mode
1
Winding protec-
tion contact
(WSK)
Ready DEL (
item 2
)
ON
- Shunt missing on
the connecting
block
- Check the pump
and the connec-
tion.
Pump operation DEL
(
item 5
)
Fault DEL (
item 6
)
OFF
FLASHING
Buzzer
ON
After removing the error with the “Stop”
pushbutton (
item 9
) reset the DEL dis-
play, start the system with the
“Automatic” pushbutton (
Item 7
).
2
Overcurrent
activated
Ready DEL (
item 2
)
Ready DEL (
item 2
)
ON
ON
- Check the pump
and the potentio-
meter settings.
- Check the pump,
the float switches
or the installation.
Pump operation DEL
(
item 5
)
Fault DEL (
item 6
)
FLASHING
FLASHING
Buzzer
ON
After removing the error with the “Stop”
pushbutton (
item 9
) reset the DEL dis-
play, start the system with the
“Automatic” pushbutton (
Item 7
).
3
High water
alarm
Pump operation DEL
(
item 5
)
Fault DEL (
item 6
)
ON
ON
Buzzer
ON
After removing the error with the “Stop”
pushbutton (
item 9
) reset the DEL dis-
play, start the system with the
“Automatic” pushbutton (
Item 7
).
auto
auto
stop
off
auto
auto
stop
off
auto
auto
stop
off
auto
auto
stop
off
auto
auto
stop
off
auto
auto
stop
off
auto
auto
stop
off
auto
auto
stop
off
auto
auto
stop
off