41
Do not set the MBCB switches to ‘Off’ at this point.
Proceed as indicated in the previous points for all of the
units up to the highest number.
Verify that all of the static bypass switches are set to
‘On.’
Set the MBCB manual bypass switches on all of the
units to ‘Off.’
Following the instructions shown on the screen, move
the bypass selectors of all of the units to the NORMAL
position, starting with UPS number 1.
Attention.
When the OPEN ALL MBCB SWITCHES request
appears, the operator must set all of the MBCB switches
and/or those installed in outdoor cabinets to ‘Off.’
X-PERT
UNINTERRUPTIBLE POWER SUPPLIES (UPS)
USER MANUAL
Summary of Contents for SLC X-PERT 100
Page 1: ...SLC X PERT 80 400 kVA UNINTERRUPTIBLE POWER SUPPLIES UPS USER MANUAL...
Page 8: ...8 SALICRU Fig 3 Front view of the 400 kVA model...
Page 34: ...34 SALICRU Fig 42 Connection of three UPSs through the CAN bus for 400 kVA devices...
Page 60: ...60 SALICRU...
Page 61: ...61 X PERT UNINTERRUPTIBLE POWER SUPPLIES UPS USER MANUAL...