2.
Connection of CT current transformers in the single-phase
device.
The voltage is read directly, while the current is measured via
the external current transformers.
The current transformer is already wired. They must be
installed on the cables of phase L1, just after the IGA, making
the arrow match the direction that the current follows in the
installation when energy is fed into the network: from the
loads to the connection.
IMPORTANT
: respect the
order of phases L1, L2, L3
Pin
CT pin
Cable code
5
S1
L1 cable
6
S2
CONSUMPTION
GRID
P2
P1
Fig. 8. CT current transformer wiring diagram.
Power cables not supplied: 0.3 m mains cable (L1, N),
1.5 mm
2
cross section.
Summary of Contents for Equinox SLC EM Lite
Page 1: ...SLC EM Lite SLC EM SLC EM T ES EN FR MANUAL DE USUARIO ENERGY MANAGER...
Page 38: ...38 SALICRU...
Page 39: ...39 ES SLC ENERGY MANAGER ENERGY METER USER S MANUAL...
Page 40: ...40 SALICRU Tambi n es posible acceder a la informaci n de los inversores instalados...
Page 49: ...49 ES SLC ENERGY MANAGER ENERGY METER USER S MANUAL...
Page 51: ...SLC EM Lite SLC EM SLC EM T EN USER MANUAL ENERGY MANAGER...
Page 88: ...88 SALICRU...
Page 89: ...89 EN SLC ENERGY MANAGER ENERGY METER USER MANUAL...
Page 90: ...90 SALICRU It is also possible to access information on installed inverters...
Page 99: ...99 EN SLC ENERGY MANAGER ENERGY METER USER MANUAL...
Page 101: ...SLC EM Lite SLC EM SLC EM T FR MODE D EMPLOI ENERGY MANAGER...
Page 138: ...138 SALICRU...
Page 139: ...139 FR SLC ENERGY MANAGER ENERGY METER MANUEL D UTILISATEUR...
Page 149: ...149 FR SLC ENERGY MANAGER ENERGY METER MANUEL D UTILISATEUR...