This section covers the process of electrically connecting the new devices in the protection board of the existing installation.
Material required:
2
The current transformers (CTs) are hard-wired to the meter.
4.2. POWER SUPPLY TO THE DEVICES.
The ESM3T EQX2 network analyser constantly records the energy consumed from or fed into the grid, working much like a
standard electricity meter. The 485/WIFI 24H EQX2-T communication module transmits the data provided by the ESM3T 90D24
EQX2 / ESM3T 300D50 EQX2 network analyser and the EQUINOX2 solar inverter so that it can be displayed in the EQX-sun application.
1.
Connect power to the ESM3T 90D24 EQX2 / ESM3T 300D50 EQX2 network analyser and the 485/WiFi 24H EQX2-T communication
module.
The ESM3T 90D24 EQX2 / ESM3T 300D50 EQX2 network analyser is the first device to be installed after the IGA, followed by the 485/
WIFI 24H EQX2-T communications module. Connect as shown in the illustration below:
Caution:
Fragile
connector,
maximum torque
0.1 Nm.
Pin
Code cables
1
Cable L1
2
Cable L2
3
Cable L3
4
Cable N
ICP
IGA
ID
Network analyser
ESM3T 90D24 EQX2 / ESM3T 300D50 EQX2
Communication module
485/WIFI 24H EQX2-T
PIAs
Very important:
Maintain the
phase order
.
L1
L2
L3
N
Power cables
not supplied:
0.30 m of network
cable (L1, L2, L3, N) with
1.5 mm
2
cross-section.
Summary of Contents for EQUINOX EQX2-4002-T
Page 2: ...2 SALICRU ...
Page 35: ...35 GUÍA RÁPIDA EQUINOX INVERSORES FOTOVOLTAICOS ES ...
Page 38: ...38 SALICRU ...
Page 71: ...71 QUICK GUIDE EQUINOX PHOTOVOLTAIC INVERTERS ES EN ...
Page 74: ...74 SALICRU ...
Page 107: ...107 GUIDE RAPIDE EQUINOX INVERSEURS PHOTOVOLTAÏQUES FR ...