![Sakura M01-021E-01 Operating Manual Download Page 23](http://html.mh-extra.com/html/sakura/m01-021e-01/m01-021e-01_operating-manual_801567023.webp)
2. Installation
23
placed according to your desired work flow. (The cables will be connected
to the rear of the instrument, so do not place the instrument close to the
walls yet.)
Connecting the Cables
1. Confirm that the respective power switch of the Embedding Module and
Cryo Module has been turned OFF.
2. Connect the control cable while paying attention to the insertion direction.
3. Insert the power cord of each module into an applicable power inlet.
作業の流れ
作業の流れ
Work Flow
Work Flow
Summary of Contents for M01-021E-01
Page 5: ...Table of contents 5 ...
Page 6: ...1 Introduction ...
Page 18: ...2 Installation ...
Page 32: ...3 Explanation of Operations ...
Page 34: ...4 Error Log ...
Page 36: ...5 Troubleshooting ...
Page 46: ...6 Replacement Parts ...
Page 48: ...7 Glossary of Terms ...
Page 52: ...52 ...
Page 53: ...M01 022E 01 ...
Page 54: ...Please visit our websites www sakura finetek com www sakuraus com www sakura eu ...