- 52 -
Fig. 4.15 Two three-phase meters
4.7.2.2. Single Phase Grid & Single phase PV system
In a single phase grid & single phase PV system, one unit of three-
phase meter shall be used to sample voltage and current.
Phase C of the meter is used to sample voltage and current value
of the PV side, while Phase A of the meter is used to sample
voltage and current value of the grid side.
Please install the 3-phase meters with reference diagram as
showed in Fig. 4.16.