12
•
During the operation the housing becomes very hot! Do not operate the device for 15 minutes after
switching off.
•
The maximum ambient temperature Ta=45°C must never be exceeded. The maximum housing
temperature Tb=80°C must never be exceeded.
•
For indoor use.
•
Replace any visible cracked protective shield, filters and lens.
•
The protective shield, filters and lens will require weekly cleaning as smoke fluids tends to building up
residues, reducing the light output very quickly.
INSTALLATION
1. Installation
•
When installation keep the device far away, the heat sensitive objects and explosives sensitives objects,
leave at lease 50cm of free space around the device.
•
When the device put on horizontal place, the device must be placed directly on the place, and the
devices must be secured with a mounting holder.
•
When rigging the device on the truss and the head face on the floor, screw one clamp each via M12
screw and nut onto the mounting holder. Insert the quick-lock fasteners of the first mounting holder into
the respective holes on the bottom of the device. Tighten the quick lock fasteners fully clockwise. Install
the second mounting holder and the safety rope must be used at the same time.
•
Please use qualified safety rope, which can hold at least 10 times the weight of the fixture. You must
only safety ropes with quick links with screw cap. Pull the safety rope through the hole on the bottom of
the base and over the trussing system etc. Insert the end in the quick link and tighten the fixation screw.
A safety rope which already hold the strain of a crash or which is defective must not be used again.