Proc Sheet 2 06
myC5-2v, myC5-2m
5HPRYHDQG3ODFH
7KHYLEUDWRU
1/2
7KLVRSHUDWLRQPXVWEHPDGHDIWHUOLFHQVH6$*(0
7RROV
- Tweezers.
- Soldering iron.
- Metal dome fixture to positioning PN
1%66(
6$*(0
3UHOLPLQDU\RSHUDWLRQ
1. Remove the battery (
Proc Sheet 0 01
).
2. Remove mobile lower housing (
Proc Sheet 1 01
).
3. Remove equipped electronic board (
Proc Sheet 1 18
).
4. Remove the keypad (
Proc Sheet 1 04
).
5. Remove mobile upper housing (
Proc Sheet 1 13
).
6. Remove FLAP upper housing (
Proc Sheet 1 32
).
5HPRYDOSURFHGXUH
1. Disolder the vibrator ( 1 ).
2. Unstick the vibrator ( 2 ) from the FLAP lower housing making level control with tweezers.
3ODFHPHQWSURFHGXUH
1. Solder the vibrator ( 1 ) and position the string of the vibrator in the area overmold ( 3 ).
2. Position the vibrator in its area ( 4 ).
)XUWKHURSHUDWLRQ
1. Place FLAP upper housing (
Proc Sheet 1 32
).
2. Place mobile upper housing (
Proc Sheet 1 13
).
3. Place the keypad (
Proc Sheet 1 04
).
4. Place equipped electronic board (
Proc Sheet 1 18
).
5. Place mobile lower housing (
Proc Sheet 1 01
).
6. Place the battery (
Proc Sheet 0 01
).
Risk of the procedure :
•
Stripe the lower et upper FLAP housing.
Procedure
Symptom
Test
REF MTB DTS 1- Indice A - December 16 2005
Page 5-33