Safeway water 4 Stage Ro Installation & Maintenance Manual Download Page 11

Sink

Sink

Disposal

Do not install here 

 

Install here 
(1/4” drain saddle valve)

Step 5 – Start-Up

1. Sanitize the storage tank.

2. Check system to verify all components are correctly installed

3. Open inlet valve and tank valve.

4. Check system thoroughly for leaks. If any are found, shut off both inlet and tank valves and correct the issue.

5. Allow system to run & fill tank for 1-2 hours. You will hear the water running to drain while the unit is running. 

  Once the water stops running to drain the tank is full.

6. Open faucet to flush carbon fines & sanitization solution. Once the flow begins to slow down (around 20 

  minutes after opening) turn off the faucet.

7. Allow the tank to fill completely again.

8. Once full, open the faucet and allow the water to run for 24 hours to break-in the RO membrane and 

  completely flush the system. This will allow your system to run at optimal efficiency.

9. Close faucet and allow tank to fill.

10. System is ready to use

4. Attach 1/4” black tube by slipping the tube through the black compression nut and hand tighten the nut on to 

   the saddle valve.

Many  homes  are  equipped  with  disposals  and 

dishwashers. Home drain plumbing must be free of 

any blockage since this may cause a backup of 

dishwasher and disposal waste into the drain line 

and result in improper performance. To perform a 

simple drain check, fill the sink basin with several 

inches of water, pull the plug, and observe the drainage. 

If water backs up into the second sink (if present), or 

if drainage is slow or there is excessive gurgling, drain 

blockage may be present. Undersink drain plumbing 

usually resembles one of the following descriptions. 

In all cases, the drain tubing from RO membrane filter should run downward, free of dips and loops. This can 

vent sewer gas, which will produce foul odors.

CAUTION! 

The drill should be kept straight and centered to avoid damaging the saddle valve.

I

 Installation & Maintenance Guide 9

Summary of Contents for 4 Stage Ro

Page 1: ...he instructions carefully before using or installing the product and ensure that the manual is kept in a safe place for future reference The system must be properly installed and located in accordance...

Page 2: ...I Installation Maintenance Guide...

Page 3: ...eriodically to verify that the system is performing properly SAFE PRACTICES Throughout this manual there are paragraphs set off by special headings Note Note is used to emphasize installation operatio...

Page 4: ...Manufacturer s Specification only with inlet conditions of 50 psi 25 77 going to atmosphere The actual volume of product water and rejection percentage will bary with differences from the test condit...

Page 5: ...llons 5 678 Liters 1 500 Gallons 5 678 Liters 2 500 Gallons 9 463 Liters 2 500 Gallons 9 463 Liters Dimensions Replacement Cartridge 100mm Total 548mm 100mm 200mm 200mm Cupboard Wall Note Rated life a...

Page 6: ...both Special sampling procedures are needed for a lab to determine what type and how much of each type of arsenic is in the water Check with the labs in your area to see if they can provide this type...

Page 7: ...INSTALLATION DIAGRAM 1 4 Angle Stop Adaptor Valve ASVPP1 1 4 Orange Tube NCPV 893 CP KR01 1 4 Blue Tube J G Tank Shut Off Valve 1 4 White Tube Pressure Tank TP 12P 1 4 Drain Saddle Valve 1 4 Black Tub...

Page 8: ...drilled at the time of installation It may also be mounted to an adjacent counter top It should be positioned so that water is dispensed over the sink A 7 8 diameter hole is required Important consid...

Page 9: ...epped 7 8 drill bit If no stepped bit is available start by drilling a 1 4 hole Using this hole as a starting point progressively drill larger holes Increase drill size by 1 8 until you reach a 7 8 ho...

Page 10: ...the standard faucets drill a 1 4 hole through one side of the pipe The drill should be kept straight and centered to avoid damaging the saddle valve Do not drill through both sides of the pipe CAUTION...

Page 11: ...n at optimal efficiency 9 Close faucet and allow tank to fill 10 System is ready to use 4 Attach 1 4 black tube by slipping the tube through the black compression nut and hand tighten the nut on to th...

Page 12: ...the actual performance of the RO membrane filter to the standard temperature of 77 F 25 C This allows the performance of the unit to be accurately gauged against published standards Temperature does...

Page 13: ...a Use optional large tank for more storage capacity b Insufficient feed water flow b 1 Clogged shut off valve or feed tubing clean out or replace 2 Clogged prefilter replace 3 Clogged manifold clean o...

Page 14: ...a Carbon fines a Flush polishing filter 11 Low faucet pressure a Inadequate pre charge pressure in storage tank a Check tank pre charge pressure and add air if required b Polishing filter plugged b Re...

Page 15: ...ion before or after the system 4 Damage to the product caused by accident fire floods or acts of God 5 Incidental or consequential damage caused by possible defects with this application it s installa...

Page 16: ...ROFILTRATION SYSTEM...

Reviews: