Return to Table of Contents
Ref: FROGLINE_Surface_Mounted_Standing_Seam_Handbook
Page 8 of 16
Doc ID: MKT-383 Version: 13.0
FROGLINE SURFACELINK
–
ASSEMBLING
LIFELINE CABLE
Following cables can be used for SafetyLink lifeline systems,
•
Cable (STAT.CABLE001): 8mm dia, 7x7 wire rope
•
Cable (STAT.CABLE_8MM_7X19_SS): 8mm dia, 7x19 wire rope. It provides high flexibility and suited for
lifelines with short intermediate intervals and multiple corners.
ASSEMBLING STEPS FOR END, INTERMEDIATE AND CORNER UNITS
STEP 1
Bolt all four clamps under plate, ensuring the set
screws are all facing the same direction.
STEP 2
Place FrogLine Intermediate/End/Corner Base on top
of Plate with 70 OD Black Washer between them.
Insert M16 x 35mm Bolt through FrogLine
Intermediate/End/Corner Base and Plate.
STEP 3
Place the 70 OD Black Plastic, then 70mm stainless
steel washer onto M16 x 35mm Bolt underneath plate.
STEP 4
Place M16 Spring Washer and M16 Nut onto M16 x
35mm Bolt to secure unit together. Tighten Nut and
Bolt making certain the Intermediate/End/Corner
Base Unit lines up with the intended direction of the
lifeline system.
Note: Threads need to have a minimum of
six full 360º turns
into the ultimate thread.