
PESD
™
8
Maintenance:
A clear view of the front indicator window must be maintained. Removal of dust,
grime, or other contaminents should preformed by gently wiping them off with a clean damp cloth.
If power cannot be removed, use insulative gloves. Do not use harsh chemicals.
O-ring inspection/replacement:
See pg. 4 or 5 for details, the mounting K.O.
hole size determines the DWG #.
M20 K.O.: CONTROL DWG #206
3/4” K.O.: CONTROL DWG #207
Nut Torque:
The nut tightening torque required to maintain seal with full o-ring compression is
about 10 in-lbs. However, this torque level can still allow the housing to be manually rotated.
Tightening torque must be increased further to around 15 to 30 in-lbs in order to restrict rotational
movement to a minimal amount. With moderate rotational hand force, it is normal for the o-ring
to allow a little cushioned amount of back and forth movement but should not allow continued
rotation.
Weight:
12 oz. \ 0.34 kg
Note: Product weight includes mounting hardware, manual and packing materials are excluded.
Summary of Contents for R-3D2 Series
Page 4: ...PESD 4 Mounting Instructions for M20 Knock Out Mount MA Control Dwg 206 R 3D2 ...
Page 11: ...PESD 11 R 3D2 R 3D2 SR WIRING INSTRUCTIONS AC APPLICATIONS ...
Page 12: ...PESD 12 WIRING INSTRUCTIONS R 3D2 R 3D2 SR DC APPLICATIONS ...
Page 13: ...PESD 13 WIRING INSTRUCTIONS R 3D2 W5 R 3D2 SRW5 AC APPLICATIONS ...
Page 14: ...PESD 14 R 3D2 W5 R 3D2 SRW5 DC APPLICATIONS WIRING INSTRUCTIONS ...
Page 16: ...16 ...
Page 25: ...25 ...
Page 34: ...34 ...
Page 60: ......