
7
6. For DC configured power see “DC Applications” on pages 12 & 14.
7.
Verifying Proper Operation: First disconnect all equipment that may introduce a hazard and notify personnel
before powering the panel!
TURN POWER ON.
With up to 600V 3~ applied, the L1, L2, and L3 indicators should flash or glow according
to respective model “FLASH RATE” Specifications on PG. 15 & 16. The type of power system grounding
configuration determines if the GND indicator normally indicates (See
GND Indicators,
PG.
15).
8.
TURN POWER OFF.
All indicators should be extinguished.
Note:
If only a single LED illuminates for any (2)
indicator pairs,
STORED ENERGY
is likely present and must be removed or discharged. All indicators must be
extinguished or a shock hazard is present on the monitored lines.
9. To complete proper installation, verify proper grounding of the GND lead-wire.
Use this procedure to insure proper grounding:
a. Complete normal installation and apply power to the R-3D2, if the GND LEDs do not illuminate, proceed
to step b.
b. Remove power and re-establish an electrical safe work condition to allow one phase lead-wire to be discon-
nected from its source by either disconnecting wire or pull a fuse.
c. Re-apply power and verify that the GND LEDs and Neutral (N) LEDs for Wye models now illuminate. If not,
remove power & provide current with a 1M-2M ohm 1W resistor temporarily connected from any phase to
ground. Repeat step c.
d. To complete installation, disconnect power before removal of step c.) resistor & to restore the phase
lead-wire or fuse. Reapply power to reverify that L1, L2, & L3 LEDs illuminate.
BEFORE OPENING A PANEL, TURN POWER OFF!
(Steps 1-9 must first verify proper operation of indicators.)
SAFETY PROCEDURES STILL APPLY:
Before working on an electrical conductor, verify zero electrical energy with
proper voltage testing instrument and the proper procedure as per NFPA 70E 120.1(5), 120.2 (F)(2)(f)(1-6), OSHA
1910.333(b)(2)(iv)(B).
Summary of Contents for R-3D2 Series
Page 4: ...PESD 4 Mounting Instructions for M20 Knock Out Mount MA Control Dwg 206 R 3D2 ...
Page 11: ...PESD 11 R 3D2 R 3D2 SR WIRING INSTRUCTIONS AC APPLICATIONS ...
Page 12: ...PESD 12 WIRING INSTRUCTIONS R 3D2 R 3D2 SR DC APPLICATIONS ...
Page 13: ...PESD 13 WIRING INSTRUCTIONS R 3D2 W5 R 3D2 SRW5 AC APPLICATIONS ...
Page 14: ...PESD 14 R 3D2 W5 R 3D2 SRW5 DC APPLICATIONS WIRING INSTRUCTIONS ...
Page 16: ...16 ...
Page 25: ...25 ...
Page 34: ...34 ...
Page 60: ......