English 8 English
Introduction
PRESTOJET 30K
allows for cutting and grid.
The complete package
PRESTOJET 30K
contains:
Work lead – 6m,
Cutting Plasma Hand Torch LC30 – 4m,
USB
user
manual.
PRESTOJET 30K
has a built-in compressor that allow to
operates in areas where an external primary air is not
available.
Recommended equipment, which can be bought by user,
was mentioned in the chapter "Accessories".
PRESTOJET 45
allows for cutting, grid and gouging.
The complete package
PRESTOJET 45
contains:
Work lead – 6m,
Cutting Plasma Hand Torch LC45 – 6m,
USB
user
manual.
Recommended equipment, which can be bought by user,
was mentioned in the chapter "Accessories".
Installation and Operator Instructions
Read this entire section before installation or operation of
the machine.
Location and Environment
This machine will operate in harsh environments.
However, it is important that simple preventative
measures are followed to assure long life and reliable
operation.
Do not place or operate this machine on a surface with
an incline greater than 15° from horizontal.
Do not use this machine for pipe thawing.
This machine must be located where there is free
circulation of clean air without restrictions for air
movement to and from the air vents. Do not cover the
machine with paper, cloth or rags when switched on.
Dirt and dust that can be drawn into the machine
should be kept to a minimum.
This machine has a protection rating of IP23S. Keep it
dry when possible and do not place it on wet ground
or in puddles.
Locate the machine away from radio controlled
machinery. Normal operation may adversely affect the
operation of nearby radio controlled machinery, which
may result in injury or equipment damage. Read the
section on electromagnetic compatibility in this
manual.
Do not operate in areas with an ambient temperature
greater than 40°C.
Duty Cycle
The duty cycle of a welding machine is the percentage of
time in a 10 minute cycle at which the welder can operate
the machine at rated welding current.
Example: 60% duty cycle:
Cutting for 6 minutes.
Break for 4 minutes.
Excessive extension of the duty cycle will cause the
thermal protection circuit to activate.
Minutes
or
decrease
Duty Cycle
Input Supply Connection
WARNING
Only a qualified electrician can connect the equipment to
the supply network. Installation had to be made in
accordance with the appropriate National Electrical Code
and local regulations.
Check the input voltage, phase and frequency supplied to
this machine before turning it on. Verify the connection of
ground wires from the machine to the input source.
PRESTOJET 30K & 45
must be connected to a correctly
installed plug-in socket with an earth pin. Input voltage is:
PRESTOJET 30K
230Vac 50Hz,
PRESTOJET 45
120Vac, 230Vac 50Hz.
For more information about input supply refer to the
technical specification section of this manual and to the
rating plate of the machine.
Make sure that the amount of mains power available from
the input supply is adequate for normal operation of the
machine. The necessary delayed fuse or circuit breaker
and cable sizes are indicated in the technical specification
section of this manual.
WARNING
The equipment can be supplied from a power generator of
output power at least 30% larger than input power of the
cutting machine.
WARNING
When powering the machine from a generator be sure to
turn off machine first, before generator is shut down, in
order to prevent damage to equipment!