background image

9

English

machine off and check the problem. After having ensured that the water flow has been reestablished,

turn the machine on. If the led is still illuminated, call your authorized dealer.

• The 

 led blinks when a failure in the water level control occurs. Call your authorized dealer.

Shortage of coffee:

The led located above the 

 symbol illuminates when the coffee bean hopper is empty. Refill it with

coffee beans and press the selection button corresponding to the desired product.
If after having refilled the bean hopper the led is still on, check that the CLOSING knob is turned to

“OPEN” (fig.9).

Coffee dreg drawer full:

The led above the 

 symbol blinks when the dreg drawer is full. If the drawer is not emptied after 8

servings, the led illuminates and the machine stops working. Once the dreg drawer has been emptied

the machine will start working again.

Fig. 12

15 - CLEANING AND MAINTENANCE

• For proper operation the machine has to be cleaned every

day.

Coffee nozzle:

 Remove the nozzle by gently pulling it

towards the outside (fig.12) wash it in hot water and then

reinstall it.

• Brew group:

 Remove the coffee nozzle, open the stainless

steel door and remove the brew group rotating the release

mechanism to position 3 (fig.13). Clean the back panel

with a damp sponge. Wash the brew group in warm
water, dry it well, and reinstall it into the machine rotating

the release mechanism to position 3. Pay attention that the

reference arrows on the central shaft are well aligned

(Align them by means of a special key when necessary). If

the brew group is well inserted, the release mechanism

should be in position 2.

Dreg drawer and drip tray:

 Empty the dreg drawer,

remove the grill, wash it in warm water and dry it. Follow

the same procedure for the drip tray.

General cleaning: 

Wipe with a damp cloth the entire

exterior as well as the cup warmer surface and the steam/

hot water nozzles.

Maintenance: 

It’s recommended to have routing

maintenence carried out by an authorized dealer .This will

ensure proper function of the machine and optimum
results. As for the  cleaning schedule see warranty certifi-

cate or follow schedule recommended at the time of

purchase. Check the number of the cycles on the counter

located under the upper pannel of the machine (fig.14)

Fig. 14

123456

°

C

ON

Fig. 13

1

2

3

Summary of Contents for PROFIMAT

Page 1: ...AND USE C ON 0 0 1 5 1 2 5 8 12 15 0 1 R Macchina per caff automatica Automatic espresso coffee machine Machine caf automatique Vollautomatische Kaffeemaschine Maquina para caf automatica profesional...

Page 2: ...d j fameuse s rie de machines qui peut vous of frir aujourd hui lameilleurecommodit etlameilleureinnovationtechnologique Ensuivantattentivement lesop rationssimplescontenuesdanscemanuel vouspourrezat...

Page 3: ...nt lectrique 18 5 Branchement hydrique 18 6 Branchement vidange 19 7 Premi re mise en fonction 19 8 Programmation des doses 20 9 Programmation de la pr mouture version De Luxe seulement 20 10 Pr parat...

Page 4: ...length Warm up time 7 min approx Power supply see data plate on the machine base Power 3200 W Revolving and thermally insulated hot water steam nozzle 3 SAFETYPRECAUTIONS For the user s safety always...

Page 5: ...n between the connectors Fig 1 E S T R O M o d P R O F IM A T 2 2 0 V 3 4 0 0 0 W 5 0 H z M a d e in It a ly N L L Neutral Line Line Ground Blue Yellow Green Fig 2 5 WATERCONNECTION Connect the machin...

Page 6: ...utes In about 5 7 minutes the pad will light to indicate that the right temperature in the boiler has been reached Ensure that the upper scale of the manometer indicates a pressure between 1 2 and 1 5...

Page 7: ...until the next coffee is dispensed In case the machine does not work for a certain period for example at night or on the week end the pre ground coffee dose may loose its flavour and occasionally the...

Page 8: ...d for pre ground coffee and then the pad for the desired selection C ON 12 USEOFSTEAM Turn the steam knob to open and let first a few drops of hot water flow out The machine is now ready to provide a...

Page 9: ...t in hot water and then reinstall it Brew group Remove the coffee nozzle open the stainless steel door and remove the brew group rotating the release mechanism to position 3 fig 13 Clean the back pane...

Reviews: