NEW ROYAL
06 STANDARD CONTROLS
Saeco International Group
Rev. 01
Page / 02
Action
1
Visual inspection (transport damage)
2
Machine data check (rating plate)
3
Operational check / problem analysis
4
Opening machine
5
Visual inspection
6
Operational tests
7
Repairing the faults encountered
8
Checking any modifi cations (view Symptom Cure, new software, etc.)
9
Service activities in accordance with the operating schedule
10
Internal cleaning
11
Operational test while the appliance is open
12
Assembly
13
Final inspection test
14
Draining the circuit (in winter)
15
External cleaning
16
Lubricating the brewing unit with suitable grease
17
Insulation test HG 701 (dielectric)
18
Documentation
S
Replacement
P
Cleaning
ES
Visual inspection
TR
Noise test
D
Descaling
R
Adjustment
CF
Operative check
Component
Action
Support/tool
Water fi lter
P/S/CF
Water tank lip seal
S/CF
Boiler pin O-ring
S/CF
Brewing unit
ES/P/CF
Grease solvent / Grease
Hoses, attachments and Oetiker clamps
ES/CF
Coffee circuit pump
ES/TR/CF
Hot water/steam circuit pump
ES/TR/CF
Gear motor
ES/TR/CF
Coffee grinder
P/R/CF
Vacuum cleaner / brush
Water circuit
D/CF
Saeco descaler
Frothing valve assembly
ES/S/CF
Multi-way valve (solenoid pilot)
ES/S/CF
6.2. Service schedule
6.1. Repair schedule
01
Services Unlimited, Inc./ Parts Guru
PartsGuru.com