ROYAL
4. FUNCTION/TIMING
Saeco International Group
REV.4 SEPT.2003
Page 17/22
2.4.1. CPU – INPUT
(Royal Professional Rapid Steam / Royal Coffeebar)
Component
Voltage
Comments
Microswitch MS1
15/5V =
Gears in home position
Microswitch MS2
15/5V =
Gears in brewing position
Microswitch MS3
15/5V =
Brewing unit
Microswitch MS4
15/5V =
Doser
Microswitch MS5
15/5V =
HWS valve
Microswitch MS6
15/5V =
Dregs drawer
JP8
JP1
JP2
JP3
JP4
JP5
MS1-
Getriebe
schalter
MS2-
Getriebe
schalter
Dosier
schalter
HWD-
schalter
Flow-meter
System 1
Temp. Sensor
System 1
MS Brüh-
gruppe
MS Satz-
schublade
CPU
JP9
JP6
Wasserstands
anzeige
Temp. Sensor
System 2
Flowmeter
System 2
nur Roy.
Coffeebar
Thermo sensor
System 1
MS2
Gear
switch
brew pos.
Doser
switch
Hot water/
Steam switch
MS brew
unit
MS dregs
drawer
Flow meter
Reed switch
Water level
MS1
Gear
switch
home pos.
Thermo sensor
System 2
only Royal
Coffebar
Summary of Contents for Cappuccino
Page 2: ......
Page 4: ......
Page 6: ......
Page 10: ......
Page 16: ......
Page 18: ......
Page 44: ......
Page 46: ......
Page 70: ......
Page 95: ...Saeco International Group REV 4 SEPT 2003 CHAPTER 6 FAULTS Page 1 Faults 1...
Page 96: ......
Page 100: ......
Page 102: ......
Page 116: ......
Page 120: ......
Page 141: ...Saeco International Group REV 4 SEPT 2003 CHAPTER 10 CIRCUIT DIAGRAMS...
Page 142: ......
Page 143: ......