JFK Product & Installation Instructions #8920100 Feb 2, 2015
Pg. 13
FIG 5
3.
Beginning with station #1, Install 2 upright assemblies (355-05) between the (355-154) 4 Station Circuit
Base & (355-01) Base Assemblies. Tighten the clamp (FIG 4A) on the lower section of each side of the
Upright Assemblies (355-05) by turning Clockwise; this will assist in maintaining the correct width and
alignment.
Note: The Base Assemblies must be parallel to each other to allow for proper and complete
horizontal adjustment of the Uprights along the length of the Base Assemblies.
4.
Using a measure tape measure the diagonal corner to corner distance of the bases in Station 1 as shown in
FIG 4 - “Station 4”. If required, loosen the clamp assembly on the uprights, of the 355-01 Base Assembly
side and slide the (355-01) Base Assembly as required to even out the diagonal distance.
5.
Then proceed to each of the 3 other stations and install one or two uprights and measure and adjust the
diagonal distance of each base. Once all uprights are installed take the time to observe your proposed
apparatus layout and ensure that there is sufficient floor space for landing mats. Make any adjustments in the
location at this point prior to proceeding to anchoring the apparatus to the concrete.
6.
On the top surface of each Base Assembly and the 4 Station Circuit Base,
there are holes which reveal the anchor holes; if the plastic caps have
been installed they must be removed to get access to the anchor holes.
(See FIG 5)
7.
Begin with the 4 Station Circuit Base by drilling the 4 holes for the floor
anchors using the 4 anchor holes in the 4 station Circuit Base as guides
(FIG 4). Drill the holes 5/8” diameter to a depth equal to the length (2
inches) of the floor 1/8”, as per Page 9 Anchor Installation.
Note: Refer to Page 9 for complete instructions on proper installation of Floor Anchors!
Note: In order to minimize the possibility that holes don’t line up as you progress to drill all the
holes, it is strongly advised, to clean out each hole after drilling and drop a 5/8” diameter
rod or bolt 5” or longer (customer supplied) in each drilled hole to help keep the apparatus
aligned to the drilled holes. (Ensure that these be easily removed after drilling all the holes)
8.
Once the 4 Station Circuit Base is drilled move on to each of the Base Assemblies (355-01) and drill the
remaining 8 holes for the floor anchors using the anchor holes in the 4 Base Assemblies as guides (FIG 4).
Drill the holes 5/8” diameter to a depth equal to the length (2 inches) of the floor 1/8”, as per Page 9
Anchor Installation.
9.
Move the apparatus aside. Vacuum the holes to remove all dust and concrete chips.
10.
Insert the floor anchors, threaded end up & slotted end down, into the drilled holes. Ensure the top of the
floor anchor is flush with or just below the top of the concrete.
11.
Set each of the floor anchors by striking the plunger in the center of the floor anchor as per Page 9.
Note: Ensure that the anchors are properly set or the safe use of the equipment may be compromised!
12.
Reposition the apparatus over the floor anchor and bolt down the 4 Station Circuit Base and Base
Assemblies (see FIG 4) loosely. Ensure that Base assemblies are Parallel to each other by installing 1 or 2
“JFK” upright assemblies (355-05) on to the 2 Bases (355-01), this will assist in maintaining the correct
width between the bases as well as maintaining them parallel to each other.
13.
Now that the uprights are installed, tighten the bolts down on the bases securely.
14.
Install the plastic caps in the indicated holes shown in FIG 5 of the top of the Bases.