365 / Instruction #8920101 Rev 4 

Pg. 8

 

Fig. 10 

 

Base and Cable Tie Down Floor Anchor Installation 
 

Note: 8 anchors in total for this assembly, drill & install anchors as described on page 7. 

 

1.

 

Mark out the location of the 4-Cable Tie-down anchors using the dimensions shown below (Fig. 10). 
Use the Diagonal Measurement (11’ 7”) to ensure the 4 anchors are square to each other. Install the 
Floor anchors, as explained on page 7 Installing Anchors. Then install Threaded Socket Adaptors.

 

 

2.

 

Next Center the cantilever assembly within this anchor pattern. Use the holes in the base legs as 
guides for drilling the 4 upright base anchors, as explained on page 7 Installing Anchors. Install the 
Anchors and fasten the Bases Down. Replace plastic caps in the base leg holes after installation.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3.

 

Attach the tie down cables using the quick links to the top of each Cantilever Upright & tighten 
Quick links using 2 adjustable wrenches, then secure the other end to the turnbuckle hook and chain 
to the Threaded Socket Adaptors (floor anchors) and. See Figure 11 below for connection points.  

 

4.

 

Once all 4 cables are connected properly, the cables can be tightened using the turnbuckles. Tighten 
each Turnbuckle equally so that the uprights remain perpendicular to the floor. See next section for 
complete instructions on rail and turnbuckle adjustments. 

 
 
 
 
 
 
 

Ensure the floor Anchors are properly set or the safe use of the equipment may be compromised 

 

 

Fig. 11 

TURNBUCKLE CONNECTION TO 

THREADED SOCKET ADAPTORS 

(FLOOR ANCHORS) 

QUICK LINK CONNECTION 

TURNBUCKLE 

 

Do not over tighten the turnbuckles as this 
may warp or damage the uprights, see note 
on subsequent page, about Adjustments. 

THREADED SOCKET 

ADAPTORS (4) 

CABLE TIE DOWN FLOOR ANCHORS (4) 

BASE LEG 

HOLE 

BASE LEG ANCHORS (4) 

FLOOR ANCHOR 

(THREADED SOCKETS) 

Summary of Contents for 365

Page 1: ...ada SA Sport U S A 135 Forestview Road 4608 Fairlane Avenue P O Box 40 Fort Worth Texas Orillia Ontario USA 76119 Canada L3V 6H9 Telephone 705 325 2274 Telephone 817 536 3366 Fax 705 325 1485 Fax 817...

Page 2: ...Assembly set up and adjustment of this equipment should only be undertaken by qualified persons At no time should children or other unqualified persons undertake the assembly set up installation or a...

Page 3: ...al Adjusting Tube Right 355 520 o c w Rail Pivot 1 ea Horizontal Adjusting Tube Left 355 521 o c w Rail Pivot 1 ea Low Rail Adjusting Bracket Assembly Right 355 530 o c w Locks 1 ea Low Rail Adjusting...

Page 4: ...holes and thread the supplied 3 8 Flat Head Screw into the hole Tighten screw firmly with a 7 32 Allen key Fig 1 3 Repeat previous step to assemble the other upright to the base tube The resulting as...

Page 5: ...Snap locks are fully engaged and that the Locking Handles are also Tightened Fig 6 3 Next insert the Short Adjusting Tubes into the Low adjusting bracket as shown in Figure 6 4 Ensure that the Snap lo...

Page 6: ...Ensure the Cable Connection links point away from center and the Adjusting Brackets face in the same direction when inserting the Assembled Cantilever Bar Uprights c w Adjusting Brackets into the Bas...

Page 7: ...n the Hammer drill drill a hole into the concrete to 2 inches 1 8 2 Use a shop vacuum or turkey baster to remove all dust and concrete chips out of the holes Ensure the hole depth is at least 2 inches...

Page 8: ...tie down cables using the quick links to the top of each Cantilever Upright tighten Quick links using 2 adjustable wrenches then secure the other end to the turnbuckle hook and chain to the Threaded S...

Page 9: ...Tube and while supporting the rail pull the Snap Lock and move the rail to the desired location Let the Snap Lock snap into a hole on the adjusting tube and tighten the Locking Handle to secure it in...

Page 10: ...50 lbs 68 kg 3 Use this equipment only under the supervision of a trained and qualified instructor 4 This equipment must be used only when protected by proper matting as recommended by the Federation...

Page 11: ...ior applications Fiberglass Rail with Wood Veneer Assembly 1 ea Part 355 65 c w mounting hardware 2 bolts Note You must use your existing 3 bolts but must exchange the old Nylock Nut with the Nylock n...

Page 12: ...se Foot Pad 1 Pair Part 355 BFP Black Foot Pad only in Pairs Threaded Socket Adaptors 1 ea Part 184 No Floor anchors provided Tie down Kit Part P230CT c w cables and turnbuckles only set of 4 No Quick...

Reviews: